My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25-REHABILITATION OF THE EAST ELEVATED STORAGE TANK
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
05 May
>
05.14.12
>
25-REHABILITATION OF THE EAST ELEVATED STORAGE TANK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 3:29:04 PM
Creation date
5/11/2012 6:34:32 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c) whether incorporation or use of the proposed substitute item in connection with <br />the Work is subject to payment of any license fee or royalty; <br />3) will identify: <br />a) all variations of the proposed substitute item from that specified, and <br />b) available engineering, sales, maintenance, repair, and replacement services; and <br />4) shall contain an itemized estimate of all costs or credits that will result directly or <br />indirectly from use of such substitute item, including costs of redesign and claims of <br />other contractors affected by any resulting change. <br />B. Substitute Construction Methods or Procedures: If a specific means, method, technique, <br />sequence, or procedure of construction is expressly required by the Contract Documents, <br />Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure <br />of construction approved by Engineer. Contractor shall submit sufficient information to allow <br />Engineer, in Engineer's sole discretion, to determine that the substitute proposed is equivalent to <br />that expressly called for by the Contract Documents. The requirements for review by Engineer <br />will be similar to those provided in Paragraph 6.05.A.2. <br />C. Engineer's Evaluation: Engineer will be allowed a reasonable tiine within which to evaluate <br />each proposal or submittal made pursuant to Paragraphs 6.05.A and 6.05.B. Engineer may require <br />Contractor to furnish additional data about the proposed substitute item. Engineer will be the sole <br />judge of acceptability. No "or equal" or substitute will be ordered, installed or utilized until <br />Engineer's review is complete, which will be evidenced by a Change Order in the case of a <br />substitute and an approved Shop Drawing for an "or equal." Engineer will advise Contractor in <br />writing of any negative determination. <br />D. Special Guarantee: Owner may require Contractor to furnish at Contractor's expense a special <br />performance guarantee or other surety with respect to any substitute. <br />E. Engineer's Cost Reiinbursement: Engineer will record Engineer's costs in evaluating a substitute <br />proposed or submitted by Contractor pursuant to Paragraphs 6.05.A.2 and 6.05.13. Whether or not <br />Engineer approves a substitute so proposed or submitted by Contractor, Contractor shall <br />reimburse Owner for the reasonable charges of Engineer for evaluating each such proposed <br />substitute. Contractor shall also reimburse Owner for the reasonable charges of Engineer for <br />making changes in the Contract Documents (or in the provisions of any other direct contract with <br />Owner) resulting from the acceptance of each proposed substitute. <br />F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or <br />"or-equal" at Contractor's expense. <br />6.06 Concerning Subcontractors, Suppliers, and Others <br />A. Contractor shall not employ any Subcontractor, Supplier, or other individual or entity (including <br />those acceptable to Owner as indicated in Paragraph 6.06.B), whether initially or as a <br />replacement, against whom Owner may have reasonable objection. Contractor shall not be <br />EJCDC C-700 Standard General Conditions of the Construction Contract <br />Copyright C) 2007 National Society of Professional Engineers for E.1CDC. Atl rights reserved. <br />PaQe 25 of 62 <br />l.. 389 <br />
The URL can be used to link to this page
Your browser does not support the video tag.