My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-048 RES APPROVING AGREEMENT WITH HAYTER ENG INC FOR ENGINEERING PROPOSAL AND AGREEMENT FOR PROFESSIONAL SERVICES FOR EVALUATION OF AND DESIGN OF REPAIR OF EMBANKMENT FAILURE ON TRAIL DE PARIS
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2012
>
2012-048 RES APPROVING AGREEMENT WITH HAYTER ENG INC FOR ENGINEERING PROPOSAL AND AGREEMENT FOR PROFESSIONAL SERVICES FOR EVALUATION OF AND DESIGN OF REPAIR OF EMBANKMENT FAILURE ON TRAIL DE PARIS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 10:46:52 AM
Creation date
5/29/2012 1:46:03 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HAYTER <br />ENGINEERING, INC <br />CONSULTANTS PLANNERS ENGINEERS <br />Mr. Ron Sullivan, P.E. <br />Director of Public Works <br />City of Paris <br />P.O. Box 9037 <br />Paris, TX 75461 <br />Re: Embankment Failure - Trail de Paris <br />Dear Ron: <br />4445 S.E. LOOP 286 <br />PARIS, TEXAS 75460 <br />(903) 785-0303 <br />FAX (903) 785-0308 <br />Apri l 27, 2012 <br />Via E-mail: rsullivan uparistexas. ov <br />Following our visit to the Trail yesterday and instructions from the Council Monday night, we have <br />prepared a proposal for engineering service to correct the embankment failure along the south side of the <br />Trail de Paris; which is generally (ocated on the south side of the Trail south of Golden Acres Retirement <br />Community. We wili obtain a geotechnical consultant to perform borings and studies necessary to <br />determiiie the slope stability, bearing capacity, and other relevant parameters for design. V1%e will do the <br />topographical surveying necessary to lay out the extent and shape of the existing failure. We will analyze <br />two (2) preliminary repair concepts and prepare comparative cost estimates and we will design the <br />selective alternative. Our fee includes preliminary coordination with the US Army Corps of Engineers to <br />determine their involvement in the project. If a full preconstruction notice for a Nationwide Permit <br />becomes necessary or if an individual permit is required we will provide these services at the additional <br />Iiourly rates contained in Appendix A of our contract. <br />For your information 1 have prepared a preliminary estimate of construction costs based upon gabions, <br />without extensive additional Corps requirements, of $150,000. A key element for the project will be the <br />contractor's ability to access the site and stage construction operations. If we could locate and provide to <br />the contractor a work area near the project it could be very beneficial for project costs. <br />We are prepared to begin immediately upon your authorization and will complete the project as promptly <br />as possible corresponding to the level of coordination which may be required with the Corps. Our fee for <br />the above services would be: <br />• Geotechnical Studies $8,000 <br />• Surveying, Engineering Design, and Preliminary Coordination $12,400 <br />TOTAL $20,400 <br />We appreciate this opportunity to be of service to the City of Paris. <br />S incerely, <br />,HAYT'SR ENGINEERING, INC. <br />R. Reeves Hayter, P.E. <br />President <br />Service Since 1957 <br />TBPF F-000315 <br />
The URL can be used to link to this page
Your browser does not support the video tag.