Laserfiche WebLink
5.09 <br />Acceptance of Bonds and Insurance; Option to Replace <br />21 <br />5.10 <br />Partial Utilization, Acknowledgment of Property Insurer <br />22 <br />Article 6- Contractor's Responsibilities <br />22 <br />6.01 <br />Supervision and Superintendence <br />..................................................22 <br />6.02 <br />Labor; Working Hours <br />..................................................22 <br />6.03 <br />Services, Materials, and Equipment <br />22 <br />6.04 <br />Progress Schedule <br />23 <br />6.05 <br />Substitutes and "Or-Equals" <br />23 <br />6.06 <br />Concerning Subcontractors, Suppliers, and Others ....................................................................25 <br />6.07 <br />Patent Fees and Royalties <br />..................................................27 <br />6.08 <br />Permits <br />..................................................27 <br />6.09 <br />Laws and Regulations <br />28 <br />6.10 <br />Taxes <br />...................................................28 <br />6.11 <br />Use of Site and Other Areas <br />28 <br />6.12 <br />Record Documents <br />29 <br />6.13 <br />Safety and Protection <br />29 <br />6.14 <br />Safety Representative <br />30 <br />6.15 <br />Hazard Communication Programs <br />...................................................30 <br />6.16 <br />Emergencies <br />30 <br />6.17 <br />Shop Drawings and Samples <br />31 <br />6.18 <br />Continuing the Work <br />32 <br />6.19 <br />Contractor's General Warranty and Guarantee <br />...................................................33 <br />620 <br />Indemnification <br />33 <br />6.21 <br />Delegation of Professional Design Services <br />34 <br />Article 7- <br />Other Work at the Site <br />...................................................35 <br />7.01 <br />Related Work at Site <br />35 <br />7.02 <br />Coordination <br />...................................................35 <br />7.03 <br />Legal Relationships <br />...................................................36 <br />Article 8- <br />Owner's Responsibilities <br />36 <br />8.01 <br />Communications to Contractor <br />36 <br />8.02 <br />Replacement of Engineer <br />....................................................36 <br />8.03 <br />Furnish Data <br />36 <br />8.04 <br />Pay When Due <br />....................................................36 <br />8.05 <br />Lands and Easements; Reports and Tests <br />....................................................36 <br />8.06 <br />Insurance <br />36 <br />8.07 <br />Change Orders <br />....................................................37 <br />8.08 <br />Inspections, Tests, and Approvals <br />37 <br />8.09 <br />Limitations on Owner's Responsibilities <br />37 <br />8.10 <br />Undisclosed Hazardous Environmental Condition <br />37 <br />8.11 <br />Evidence of Financial Arrangements <br />....................................................37 <br />8.12 <br /> <br />Compliance with Safety Program <br /> <br />37 <br />Article 9- <br />Engineer's Status During Construction <br />37 <br />9.01 <br />Owner's Representative <br />37 <br />EJCDC C-700 Standard General Conditions of the ConstrucHon Contract <br />Copyright @ 2007 NaHonal Society of Professional Engineers for EJCDC. All rights reserved. <br />Paee ii <br />