My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-054 RES AWARDING CONTRACT FOR REHABILITATION OF EAST ELEVATED STORAGE TANK TO CLASSIC PROTECTIVE COATINGS INC
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2012
>
2012-054 RES AWARDING CONTRACT FOR REHABILITATION OF EAST ELEVATED STORAGE TANK TO CLASSIC PROTECTIVE COATINGS INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2012 10:55:18 AM
Creation date
5/31/2012 4:36:04 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9.02 <br />Visits to Site <br />37 <br />9.03 <br />Project Representative <br />38 <br />9.04 <br />Authorized Variations in Work <br />38 <br />9.05 <br />Rejecting Defective Work <br />38 <br />9.06 <br />Shop Drawings, Change Orders and Payments <br />39 <br />9.07 <br />Determinations for Unit Price Work <br />39 <br />9.08 <br />Decisions on Requirements of Contract Documents and Acceptability of Work <br />39 <br />9.09 <br />Limitations on Engineer's Authority and Responsibilities <br />39 <br />9.10 <br />Compliance with Safety Program <br />40 <br />Article 10 - Changes in the Work; Claims .....................................................................................................40 <br />10.01 Authorized Changes in the Work ...............................................................................................40 <br />10.02 Unauthorized Changes in the Work ............................................................................................41 <br />10.03 Execution of Change Orders .......................................................................................................41 <br />10.04 Notification to Surety ..................................................................................................................41 <br />10.05 Claims ..........................................................................................................................................41 <br />Article 11 - Cost of the Work; Allowances; Unit Price Work 42 <br />11.01 Cost of the Work .........................................................................................................................42 <br />11.02 Allowances 45 <br />11.03 Unit Price Wark ..........................................................................................................................45 <br />Article 12 - Change of Contract Price; Change of Contract Times ...............................................................46 <br />12.01 Change of Contract Price 46 <br />12.02 Change of Contract Times 47 <br />12.03 Delays 47 <br />Article 13 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work .......................48 <br />13.01 Notice of Defects .........................................................................................................................48 <br />13.02 Access to Work 48 <br />13.03 Tests and Inspections ..................................................................................................................49 <br />13.04 Uncovering Work ........................................................................................................................49 <br />13.05 Owner May Stop the Work .........................................................................................................50 <br />13.06 Correction or Removal of Defective Work 50 <br />13.07 Correction Period 50 <br />13.08 Acceptance of Defective Work 51 <br />13.09 Owner May Correct Defective Work 52 <br />Article 14 - Payments to Contractor and Completion 52 <br />14.01 Schedule of Values ......................................................................................................................52 <br />14.02 Progress Payments 52 <br />14.03 Contractor's Warranty of Title 55 <br />14.04 Substantial Completion ...............................................................................................................55 <br />14.05 Partial Utilization 56 <br />14.06 Final Inspection ...........................................................................................................................57 <br />14.07 Final Payment ..............................................................................................................................57 <br />14.08 Final Completion Delayed ..........................................................................................................58 <br />EJCDC C-700 Standard General Conditions of the Construction Contract <br />Copyright C) 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Pase iii <br />
The URL can be used to link to this page
Your browser does not support the video tag.