Laserfiche WebLink
INDEX TO GENERAL CONDITIONS <br />Arlicle ar I'aragraph <br />Number <br />Acceptance ofInsurance 5.13 <br />Access to the \Vork 13.2 <br />Addenda-definition of (see definition of <br />Specifications) <br />i <br />Agreement-definition of <br />1 <br />A1l Risk Insurance <br />5.6 <br />Amendment, Wricten <br />1,3.1.1 <br />Application for Payment-definition of <br />i <br />Application for Payment, Final <br />14.12 <br />Application for Progress Payment <br />14.2 <br />Application for Progress Payment-review of <br />14.4-14.7 <br />Arbitcation <br />16 <br />Authorized Variation in Work <br />9.5 <br />Availabilicy of Lands 4.1 <br />Award, Notice of-defined <br />t <br />Before Starting Constructio n 2.5-2.7 <br />Bid-definition of 1 <br />Bonds and Insurance-in generat 5 <br />Bonds-definition of 1 <br />Bo nds, Delivery of 2.1,5.1 <br />Bonds. Pecformance and Other 5.1-5.2 <br />Cash Atlowances 11.8 <br />Change Order-definition of . 1 <br />Change Orders-to be executed 10.4 <br />Changesin the Work 10 <br />Ctaims, Waiver of-on Final Payment . 14.16 <br />Clarifications and Interpretations 9.4 <br />Cleaning 6.17 <br />Completio n 14 <br />Completion, Substantial 14.8-14.9 <br />Conference, Preconstruction 2.8 <br />Conftict, Ecror, Discrepancy-Contractor <br />to Report 2.5,3.3 <br />Construction Machinery, Equipment, etc . 6.4 <br />Co ntinuing Work 6.29 <br />Contract Documents-amending and <br />supplementing 3.4-3.5 <br />Contract Documents--definition of 1 <br />Co ntract Documents-Intent 3.1-3.3 <br />Contract Documents-Reuse of 3.6 <br />Contract Price. Change of 11 <br />Contract Price-dcfiaition 1 <br />Contract Time. Change of 12 <br />Contract Time. Commencement of 2.3 <br />Contract Time-definition of 1 <br />Contractor-de6nition of 1 <br />Contractor May Stop Worfc or Terminate 15.5 <br />Contractoc's Continuing Obligation 14.15 <br />Contractor's Duty to Report Discrepancy <br />in Documents 2.5.3.2 <br />Contractor s Fee-Cost Plus 11.4.5.6, 11.5.1. I 1.6-I t.7 <br />Contcactor's Liability Insurancc 5.3 <br />Cootractor's Responsibilities--in general 6 <br />Contractor's Warranty of Title 14.3 <br />Contractors-othcr 7 <br />Contractual Liability Insurance 5.4 <br />Coordinating Contractor-definition of 7.4 <br />Coordination 7.4 <br />Copies of Documents 2.2 <br />Correction or Removal of Defective 1Vork 13.11 <br />Correction Period, One Year 13.12 <br />Correction, Removal or Acceptance of Defective <br />Work-in general 13.11-13.14 <br />Cost-net decrease 11.6.2 <br /> <br />Cost of Work 11.4-11.5 <br />Costs, Supplemental 11.4.5 <br />Day-definitio n of 1 <br />Defective--d.efinition of t <br />Defective Work, Acceptance of 13.13 <br />Defective Work, Correction or Removal of 13.11 <br />Defective Work-in general 13, 14.7, 14.11 <br />Defective Work, Rejecting 9.6 <br />Definitio ns 1 <br /> <br />Delivery of Bonds 2.1 <br />Determination for Unit Prices 9.10 <br />Disputes, Decisions by Engineer 9. t 1-9.12 <br />Documents, Copies of 2.2 <br />Documents, Record 6.19 <br />Docu ments, Reuse 3.6 <br />Drawings-definition of i <br />Easements 4.1 <br />Effective date of Agreement--definition of 1 <br />V.., -A.,,-;Pc _ 6.22 <br />Engineer-definition of 1 <br />Engineer's Decisions 9.10-9.12 <br />Engineer's-Notice Wock is Acceptab[e 14.13 <br />Engineer's Recommendation of Payment 14.4. 14.13 <br />Engineer's Responsibilities, Limitations <br />on 6.6,9.11.9.13-9.16 <br />Engineec's Status During Construction-in genecal 9 <br />Equipment, Labor, Materiais and 6.3-6.6 <br />Equivalent Materials and Equipment 6.7 <br />Explorations of physical conditions 4.2 <br />Fee, Contractor s--Costs Plus 11.6 <br />Field Order-definition of 1 <br />Field Order-issued by Engineer 3.5.1, 9.5 <br />Final Application for Payment 14.12 <br />Final Inspection 14.11 <br />Final Payment and Acceptance 14.13 <br />Final Payment, Rccommendation of 14.13-14.14 <br />General Provisions 17.3-17.4 <br />General Requirements-de6nition of 1 <br />Gcneral Requirements-principal <br />rcfcrences to 2.6,4.4. 6.4,6.6-6.7. 6.23 <br />32 <br />