Laserfiche WebLink
c <br />Giving N otice 17.1 <br />Guarantee of Work-by Contractor . . . . . . . 13. ( <br />Indemnification <br />6.30-6.32 <br />Inspection, Final 14.11 <br />Inspection, Tests and 13.3 <br />Insurance, Bonds and-in general <br />5 <br />Insurance, Certificates of 2.7, 5 <br />Insurance-comp(eted operations <br />5.3 <br />Insurance, Contractor's Liability <br />5.3 <br />Insurance, Contractual Liability <br />5.4 <br />Insurance, Owner's Liability <br />5.5 <br />Insurance, Property <br />5.6-5.13 <br />Insurance-Waiver of Rights <br />5.11 <br />Intent of Contract Documents <br />3.3, 9.14 <br />Interpretations and Clarifications <br />9.4 <br />Investigations of physical conditions <br />4.2 <br />Labor, Materials and Equipment 6.3-6.5 <br />Laws and Regulations--definition of 1 <br />Laws and Regulations-general 6.14 <br />Liability Insurance-Contractor's . 5.3 <br />Liability Insurance-Owner's 5.5 <br />Liens-definitions of 14.2 <br />Limitations on Engineer's <br />Responsibilities 6.6, 9.11, 9.13-9.16 <br />Materials and equipment-fumished by Contractor 6.3 <br />Materials and equipment-not <br />incorporated in Work 14.2 <br />Materials or equipment-equivalent 6.7 <br />Miscellaneous Provisions 17 <br />Multi-prime contracts 7 <br />Notice, Giving of 17.1 <br />Notice of Acceptability of Project 14.13 <br />Notice of Award-definition of 1 <br />Notice to Proceed-definition of 1 <br />Notice to Proceed-giving of 2.3 <br />..Or-Equa(" Items 6.7 <br />Other contractors 7 <br />Other work 7 <br />Overtime Work-prohibition of 6.3 <br />Owner-definition of 1 <br />Owner May Correct Defective Work 13.14 <br />Owner May Stop Work 13.10 <br />Owner May Suspend Wor{c, Terminate I5.1-15.4 <br />Owner's Duty to Execute Change Orders 11.8. <br />Owner's Liability Insurance 5.5 <br />Owner's Represeatative-Engineer to serve as 9.1 <br />Owner's Responsibilities-in general 8 <br />Owner's Separate Representative at site 93 <br />Partia( Utilization 14.10 <br />Partial Utilization-definition of t <br />Partial Utilization-Property Insurance 5.15 <br />Patent Fees and Royalties 6.12 <br />Payments, Recommendation of 14.4-14.7, 14.13 <br />Payments to Contractor-in general 14 <br />Paymcnts to Conlractor-when due 14.4, 14.13 <br />Payments to Contractor-withholdins 147 <br />Pzrformance and other Bonds 5.1-5.2 <br />Permits 6.i3 <br />Physical Conditions 4.2 <br />Physical Conditions-Engineer's review 4.2.4 <br />Physical Conditions-existing structures 4.2.2 <br />Physical Conditions-exp(orations and reports 4.2.1 <br />Physical Conditions-possible document change 4:2.5 <br />Physical Conditions-price and time adjustments 4.2.5 <br />Physical Conditions-report of differing 4.2.3 <br />Physical Conditions-Underground Facilities 4.3 <br />Preconstruction Conference 2.8 <br />Preliminary Matters 2 <br />Premises, Use of 6.16-6.18 <br />Price, Change of Contract 1 t <br />Price-Contract-definition of 1 <br />Progress Payment, Applications for 14.2 <br />Progress Payment-retainage 14.2 <br />Progress schedule 2.6, 2.9, 6.6,6.29, 15.2.6 <br />Project-definition of 1 <br />Project Representation-provision for 9.3 <br />Project Representative, Resident-definition of 1 <br />Project, Starting the 2.4 <br />Property Insurance 5.6-5.13 <br />PropeRy Insurance-Partial Utilization 5.15 <br />Property Insurance-Receipt and Application <br />of Proceeds 5.12-5.13 <br />Protection, Safety and 6.20-6.21 <br />Punch list 14.11 <br />Recommendation of Payment . 14.4; 44.13 <br />Record Documents 6.19 <br />Reference Points 4.4 <br />Regulations, Laws and 6.14 <br />Rejecting Defective Work 9.6 <br />Related Work at Site 7.I-73 <br />Remedies Not Exctusive 17.4 <br />Removal or Correction of Defecrive Work 13.11 <br />Resident Project Representative-definition of 1 <br />Resident Project Representative-provision for 9.3 <br />Responsibilities, Contractor's-in general 6 <br />Responsibilities, Engineer's-in general 9 <br />Responsibilities, Owner's-in general . . 8 <br />Retainage 14.2 <br />Reuse of Documents 3.5 <br />Rights of Way 4.1' <br />Royalties, Patent Fees and 6.12 <br />Safety and Protection 6.20-6.21 <br />Samples 6.23-6.28 <br />Schedule of progress 2.6, 2.8-2.9, 6.6, 6.29, 15.2.6 <br />Schedule of Shop Drawing <br />submissions 2.6, 2.8-2.9, 6.23, 14.1 <br />Schedule of values 2.6, 2.8-2.9, 14.1 <br />Schedules, Finalizing 2.9 <br />Shop Drawings and Samples 6.23-6.28 <br />Shop Drawings-definition of I <br />Shop Drawings, use to approve substitutions 6.73 <br />33 <br />