My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02 "T" Hangar Specs--Previous
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
06 - June
>
June 28, 2001
>
02 "T" Hangar Specs--Previous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 11:16:53 AM
Creation date
6/25/2001 3:42:59 PM
Metadata
Fields
Template:
AGENDA
Item Number
02
AGENDA - Type
PLANS & SPECIFICATIONS
Description
"T" Hangar Specifications
AGENDA - Date
4/26/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Liaison: <br />a. Serve as ENGINEER's liaison with CONTRACTOR, <br />working principally through CONTRACTOR's <br />superintendent and assist in understanding the <br />intent of the Contract Documents; and assist <br />ENGINEER in serving OWNER's liaison with CONTR.ACTOR <br />when CONTRACTOR's operations affect OWNER's on-site <br />operations. <br />b. Assist in obtaining form OWNER additional details <br />or information, when required for proper execution <br />of the Work. <br />4. Shop Drawings and Samples: <br />a. Record date of receipt of Shop Drawings and Satrples. <br />b. Receive samples which are furnished at the site by <br />CONTRACTOR, and notify ENGINEER of availability of <br />samples for examination. <br />c. Advise ENGINEER and CONTR.ACTOR of the commencement <br />of any Work requiring a Shop Drawing or sample if <br />the submittal has not been approved by ENGINEER. <br />5. Review of Work, Rejection of Defective Work, Inspections <br />and Tests: <br />a. Conduct on-site observations of the Work in progress <br />to assist ENGINEER in determining if the Work is in <br />general proceeding in accordance with the Contract <br />Documents. <br />b. Report to ENGINEER whenever RPR believes that any <br />Work is unsatisfactory, faulty or defective or does <br />not conform to the Contract Documents, or has been <br />damaged, or does not meet the requirements of any <br />inspection, tests or approval required to be made; <br />and advise ENGINEER of Work that RRR believes should <br />be corrected or rejected or should be uncovered for • <br />observation, or requires special resting, inspection <br />or approval. <br />c. Verify that tests, equipment and systems startups <br />and operating an maintenance training are conducted <br />in the presence of appropriate personnel, and that <br />CONTRACTOR maintains adequate records thereof; and <br />observe, record and report to ENGINEER appropriate <br />details relative to the test procedures and <br />startups. <br />65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.