Laserfiche WebLink
d. Accompany visiting inspectors representing public <br />or other agencies having jurisdiction over <br />the Project, record the results of these inspection <br />sand report to ENGINEER. <br />6. Interpretation of Contract Documents: Report to ENGINEER <br />when clarifications and interpretations of the Contract <br />Documents are needed and transmit to CONTRACTOR <br />clarifications and interpretations as issued by ENGINEER. <br />7. Modifications: Consider and evaluate CONTRACTOR <br />suggestions for modifications in Drawings or <br />Specifications and report with RPR's recommendations to <br />ENGINEER. Transmit to CONTRACTOR decisions as issued by <br />ENGINEER. <br />8. Records: <br />a. Keep a diary or log book, recording CONTRACTOR hours <br />on the job site, weather conditions, data relative <br />to question of Work Directive Changes, Change Orders <br />or changed conditions, list of job site visitors, <br />daily activities, decisions, observations in <br />general, and specific observations in more detail <br />as in the case of observing test procedures; and <br />send copies to ENGINEER. <br />b. Record names, addresses and telephone numbers of all <br />CONTRACTOR, subcontractors and major suppliers of <br />materials and equipment. <br />9. Reports: <br />a. Furnish ENGINEER periodic reports as required of <br />progress of Work and of CONTR.ACTOR's compliance with <br />the progress schedule and schedule of Shop Drawing <br />and sample submittals. <br />b. Consult with ENGINEER in advance of scheduled major <br />test, inspections or start of important phases-of <br />the Work. . <br />c. Draft proposed Change Orders and Work Directive <br />Changes, obtaining backup material from CONTRACTOR <br />and recommend to ENGINEER Change Orders, Work <br />Directive Changes, and Field Orders. <br />d. Report immediately to ENGINEER and OWNER upon the <br />occurrence of any accident. <br />66 <br />