My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02 "T" Hangar Specs--Previous
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
06 - June
>
June 28, 2001
>
02 "T" Hangar Specs--Previous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 11:16:53 AM
Creation date
6/25/2001 3:42:59 PM
Metadata
Fields
Template:
AGENDA
Item Number
02
AGENDA - Type
PLANS & SPECIFICATIONS
Description
"T" Hangar Specifications
AGENDA - Date
4/26/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. Payment Requests: Review applications for payment with <br />CONTRACTOR for compliance with the established procedure <br />for their submission and forward with recommendations to <br />ENGINEER, noting particularly the relationship of the <br />payment requested to the schedule of values, Work <br />completed and materials and equipment delivered at the <br />site but not incorporated in the Work. <br />11. Certificates, Maintenance and Operation Manuals: During <br />the course of the Work, verify that certificates, <br />maintenance and operation mariuals and other data required <br />to be assembled and furnished by CONTRACTOR are <br />applicable to the items actually installed and in <br />accordance with the Contract Documents, and have this <br />material delivered to ENGINEER for review and forwarding <br />to OWNER prior to final payment for the Work. <br />12. Completion: <br />a. Before ENGINEER issues a Certificate of Substantial <br />Completion, submit to CONTRACTOR a list of observed <br />items requiring completion or correction. <br />b. Conduct final inspection in the company of ENGINEER, <br />OWNER and CONTRACTOR and prepare a final list of <br />items to be completed or corrected. <br />c. Observe that all items on final list have been <br />completed or corrected and make recommendation to <br />ENGINEER concerning acceptance. <br />C. Limitations of Authority <br />Resident Project Representative: <br />1. Shall not authorize any deviation from the Contract <br />Documents or substitution of materials or equipment, <br />unless authorized by ENGINEER. <br />2. Shall not exceed limitations of ENGINEER's authority= <br />as set forth in the Contract Documents. <br />3. Shall not undertake any of the responsibilities of <br />CONTRACTOR, subcontractors or CONTRACTOR's <br />superintendent. <br />4. Shall not advise on, issue directions relative to or <br />assume control over any aspect of the means, methods, <br />techniques, sequences or procedures of construction <br />unless such advice or directions are specifically <br />required by the Contract Documents. <br />67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.