My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02 "T" Hangar Specs--Previous
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
06 - June
>
June 28, 2001
>
02 "T" Hangar Specs--Previous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 11:16:53 AM
Creation date
6/25/2001 3:42:59 PM
Metadata
Fields
Template:
AGENDA
Item Number
02
AGENDA - Type
PLANS & SPECIFICATIONS
Description
"T" Hangar Specifications
AGENDA - Date
4/26/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Shall not advise on, issue directions regarding or assume <br />control over safety precautions and programs in <br />connection with the Work. <br />6. Shall not accept Shop Drawing or sample submittals form <br />anyone other than Contractor. <br />7. Shall not authorize OWNER to occupy the Project in whole <br />or in part. <br />8. Shall not participate in specialized field or laboratory <br />tests or inspections conducted by others except as <br />specifically authorized by ENGINEER. <br />SC 11.9.3 <br />Paragraph 11.9.3 of the General Conditions is hereby deleted <br />in its entirety and the following is substituted in its place: <br />"The unit price of an item of Unit Price Work shall be subject <br />to reevaluation and adjustment under the following conditions: <br />11.9.3.1 if the total cost of a particular item of Unit Price Work <br />amount to 25$ or more of the Contract Price and the <br />variation in the quantity of that particular item of Unit <br />Price Work performed by Contractor differs by more that <br />10% from the estimated quantity of such item indicated <br />in the Agreement; and <br />11.9.3.2 if there is no corresponding adjustment with respect of <br />any other item of Work; and <br />11.9.3.3 if CONTRACTOR believes that it has incurred additional <br />expense as a result thereof; or <br />11.9.3.4 if OWNER believes that the quantity variation entitles <br />it to an adjustment in the unit price, either OWNER or <br />CONTRACTOR may make a claim for an adjustment in the <br />Contract Price in accordance with Article 11 if the <br />parties are unable to agree as to the effect of any such <br />variations in the quantity of Unit Price Work performed." . <br />SC 14.16.3 <br />Add a new paragraph immediately after paragraph 14.16.2 of the <br />General Conditions which is to read as follows: <br />SC 14.16.3 <br />The CONTR.ACTOR shall deliver to the OWNER three (3) fully <br />executed original copies of "Receipt of Payment and <br />Release of Liens" form included herein. The delivery.- <br />of said form to OWNER must occur no later than the <br />simultaneous deliver of Final Payment to CONTRACTOR. <br />68 <br />
The URL can be used to link to this page
Your browser does not support the video tag.