My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-D StreetScape Proposals
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
07 - July
>
July 09, 2001
>
05-D StreetScape Proposals
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:24:12 AM
Creation date
7/6/2001 1:38:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
5-D
AGENDA - Type
PROPOSALS
Description
StreetScape Project
AGENDA - Date
7/9/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HAYTER <br />ENGINEERING, INC. <br /> <br />CONSULTANTS PLANNERS ENGINEERS <br /> <br />4445 S.E. LOOP 286 <br />PARIS, TEXAS 75460 <br />F903) 785-0303 <br /> AX (903) 785-0308 <br /> <br />November 8, 2000 <br /> <br />City of Paris <br />135 SE Ist Street <br />Paris, TX 75460 <br /> <br />ATTENTION: Mr. Tommy Haynes <br /> <br />REFERENCE: Letter of Interest <br /> Downtown Sidewalk Renovation Project <br /> <br />Dear Mr. Haynes: <br /> <br />In response to the City's request for Letters of Interest for engineering services on the subject project, <br />we appreciate this opportunity to express our interest and outline our qualifications. <br /> <br />We understand the project is to involve removal and replacement of sidewalks and curb and gutter <br />around the Plaza, and for about 1/2 block from the Plaza in each direction. New sidewalks would <br />meet applicable handicap accessibility requirements, and contain decorative elements as well as <br />historic lighting, planting areas, landscape irrigation and related features. Some of the sidewalks will <br />he structural, spanning basements of the adjoining buildings. The project is partially funded through <br />the TxDOT TEA 21 program, and coordination with TxDOT will be an integral part of this <br />assignment. <br /> <br />Our firm currently has 4 projects underway which illustrate experience and qualifications on projects <br />of a similar nature. Two of these are in Bonham -- <br /> <br />Bonham Central Business District Improvements -- This $820,865 project involves the <br />removal and replacement of existing sidewalks and curbs around the square in downtown <br />Bonham. Historic lighting is being installed, together with landscape areas and irrigation. <br />This project is being funded by the City of Bonham and the Texas Capital Fund. Since both <br />the south and the east sides of the square are state highways, coordination with TxDOT has <br />been an integral part of the project. David Beard, P.E., is serving as project manager for this <br />project, on which construction is currently about 50% complete. Alan Vanderburg, P.E., <br />provided the electrical design for the historic lighting. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.