Phase II - Scope of Work - Asbestos Abatement <br />Grand Theatreâ–  21 Lamar Avenue, Paris, Texas <br />June 4, 2012 â– Terracon Project No. 94107645 <br />Irerracon <br />SCOPE OF WORK - ASBESTOS ABATEMENT <br />PHASE II - Grand Theatre <br />21 Lamar Avenue <br />Paris, Texas <br />Terracon Project No.94107645 <br />1.0 INTRODUCTION <br />The work will consist of the abatement of asbestos containing materials identified within <br />the scope of work. The asbestos abatement design is dated June 4, 2012. <br />2.0 MATERIAL DESCRIPTtON AND QUANITITIES <br />Briefly and without force and effect upon the contract documents, the work of the <br />Contract can be summarized as including removal and disposal of asbestos-containing <br />materials associated with: <br />Acoustical Ceiling Texture - 10 % Chrysotile Asbestos <br />Floor tile/floor tile mastic - 3-10% Chrysotile Asbestos <br />Thermal Pipe/Fitting Insulation - 60% Chrysotile Asbestos <br />Thermal Duct Insulation - 60% Chrysotile Asbestos <br />Thermal Tape - 60% Chrysotile Asbestos <br />Quantities listed are estimates only. The CONTRACTOR is responsible for verifying <br />quantity estimates prior to submission of bid. The CONTRACTOR will perform work for <br />materials and locations indicated, regardless of actual quantities, and no increase in <br />Contract amount will be allowed for quantity adjustment. <br />First Floor - Theater/Office Area (see attached drawing) <br />Acoustical Ceiling Texture <br />Floor Tile/Floor Tile Mastic <br />Thermal Tape Insulation <br />2,100 square feet (sq. ft.) <br />1,800 sq. ft. <br />200 linear feet <br />Second Floor -Office Area/Restrooms (see attached drawinq) <br />Floor Tile/Floor Tile Mastic 200 sq. ft. <br />le rroughs <br />TDSHS Li se 10-5095 <br />Expiration ~ 02.09.13 <br />