My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
14-MOVE TO APPROVE RES ACCEPTING BID AND AWARDING CONTRACT FOR SECOND PHASE OF HAZARDOUS MATERIALS REMEDIATION OF GRAND THEATER TO NCM DEMOLITION AND REMEDIATION LP
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
06 June
>
06.25.12
>
14-MOVE TO APPROVE RES ACCEPTING BID AND AWARDING CONTRACT FOR SECOND PHASE OF HAZARDOUS MATERIALS REMEDIATION OF GRAND THEATER TO NCM DEMOLITION AND REMEDIATION LP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 10:59:46 AM
Creation date
6/20/2012 10:49:50 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase II - Scope of Work - Asbestos Abatement lrerracon <br />Grand Theatreâ– 21 Lamar Avenue, Paris, Texas <br />June 4, 2012 â– Terracon Project No. 94107645 <br />DANGER <br />CONTAINS ASBESTOS FIBERS <br />AVOID CREATING DUST <br />CANCER AND LUNG DISEASE HAZARD <br />3. The area between the bag-out area and the prepared waste receptacle shall <br />be regulated with barrier tape during bag-out operations. The waste <br />dumpster or trailer shall remain secured during all other periods. <br />4. The waste will be disposed in an approved landfill. The waste will be <br />transported to the landfill in a lined closed top receptacle. Verification of <br />disposal at the landfill will be provided to the OWNER by CONTRACTOR via <br />the Uniform Hazardous Waste Manifest signed by the landfill. . <br />5. The waste will be transported to the landfill in a lined closed top receptacle. <br />Verification of disposal at the landfill will be provided to the OWNER by <br />CONTRACTOR via the Uniform Hazardous Waste Manifest. <br />3.6 Clearance <br />Aggressive PCM clearance sampling will be conducted in accordance with the NIOSH <br />7400 Method, in each contained area in which abatement has occurred. <br />Static up and down wind air sampling will be conducted during the abatement of the <br />exterior thermal pipe insulation. <br />4.0 CONTRACTOR SUBMITTALS <br />Submittals required for proper execution include but are not limited to the following: <br />Pre-Construction Submittals (submitted to CONSULTANT): <br />Regulatory Notification Information <br />Plan of Action <br />Fire Action Plan <br />Emergency Phone List <br />Project Schedule <br />n#rroug hs <br />TD SHS Lic -5095 <br />Expiration 09.13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.