My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
14-MOVE TO APPROVE RES ACCEPTING BID AND AWARDING CONTRACT FOR SECOND PHASE OF HAZARDOUS MATERIALS REMEDIATION OF GRAND THEATER TO NCM DEMOLITION AND REMEDIATION LP
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2012
>
06 June
>
06.25.12
>
14-MOVE TO APPROVE RES ACCEPTING BID AND AWARDING CONTRACT FOR SECOND PHASE OF HAZARDOUS MATERIALS REMEDIATION OF GRAND THEATER TO NCM DEMOLITION AND REMEDIATION LP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 10:59:46 AM
Creation date
6/20/2012 10:49:50 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase II - Scope of Work - Asbestos Abatement Irerracon <br />Grand Theatreâ– 21 Lamar Avenue, Paris, Texas <br />June 4, 2012 â– Terracon Project No. 94107645 <br />Discrepancies or needed corrective measures observed by the CONSULTANT will be <br />reported to the CONTRACTOR'S Superintendent on-site and shall be immediately <br />corrected. <br />The above inspections are not necessarily single events. Failed inspections will be re- <br />conducted and time classified as retests and charged back to the CONTRACTOR in <br />accordance with the project documents. Inspections will require 24 hours advance <br />notice to the CONSULTANT. <br />PERSONAL MONITORING: <br />The CONTRACTOR shall perform air monitoring as required to meet OSHA <br />requirements for maintenance of Time Weighted Average (TWA) and excursion limit <br />fiber counts for types of respiratory protection provided. The OWNER will not be <br />providing air monitoring services to meet these OSHA requirements. Note: Results of <br />Personal Monitoring shall be submitted to the CONSULTANT within 72 hours of the time <br />samples are obtained. A listing of all personal monitoring results obtained during the <br />project shall be submitted to the CONSULTANT with the CONTRACTOR closeout <br />submittals. <br />LABORATORY TESTING: <br />The CONSULTANT will perform field analysis of the air samples. A microscope and <br />field laboratory will be set up at the jobsite, at the option of the CONSULTANT, so that <br />verbal reports on air samples can be obtained promptly after collection. <br />Reports to the OWNER by the CONSULTANT will include air monitoring data and <br />pertinent information on work being conducted such as: work hours, number of workers, <br />procedures used, CONTRACTOR discrepancies and corrective measures, containment <br />methods and construction, and amount of ACM removed. <br />Ky Burroughs <br />TDSHS Li ens #10-5095 <br />Expiration : 02.09.13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.