Laserfiche WebLink
Phase II - Scope of Work - Asbestos Abatement Irerracon <br />Grand Theatreâ–  21 Lamar Avenue, Paris, Texas <br />June 4, 2012 â– Terracon Project No. 94107645 <br />Discrepancies or needed corrective measures observed by the CONSULTANT will be <br />reported to the CONTRACTOR'S Superintendent on-site and shall be immediately <br />corrected. <br />The above inspections are not necessarily single events. Failed inspections will be re- <br />conducted and time classified as retests and charged back to the CONTRACTOR in <br />accordance with the project documents. Inspections will require 24 hours advance <br />notice to the CONSULTANT. <br />PERSONAL MONITORING: <br />The CONTRACTOR shall perform air monitoring as required to meet OSHA <br />requirements for maintenance of Time Weighted Average (TWA) and excursion limit <br />fiber counts for types of respiratory protection provided. The OWNER will not be <br />providing air monitoring services to meet these OSHA requirements. Note: Results of <br />Personal Monitoring shall be submitted to the CONSULTANT within 72 hours of the time <br />samples are obtained. A listing of all personal monitoring results obtained during the <br />project shall be submitted to the CONSULTANT with the CONTRACTOR closeout <br />submittals. <br />LABORATORY TESTING: <br />The CONSULTANT will perform field analysis of the air samples. A microscope and <br />field laboratory will be set up at the jobsite, at the option of the CONSULTANT, so that <br />verbal reports on air samples can be obtained promptly after collection. <br />Reports to the OWNER by the CONSULTANT will include air monitoring data and <br />pertinent information on work being conducted such as: work hours, number of workers, <br />procedures used, CONTRACTOR discrepancies and corrective measures, containment <br />methods and construction, and amount of ACM removed. <br />Ky Burroughs <br />TDSHS Li ens #10-5095 <br />Expiration : 02.09.13 <br />