Shop Drawingx--AIl drawings, diagramS, illustrations,
<br />schedules and other data ~vhlch arc specifically prepared by
<br />or for CONTRACTOR to illustrate some portion of the Work
<br />and all illustrations, brochures, standard schedules, perfor-
<br />mance charts, instrUctions, diagrams and other information
<br />prepared by a Supplier and submitted by CONTRACTOR to
<br />illustrate material or equipment for some portion of the Work.
<br /> Specifications--Those portions of the Contract Documents
<br /> consisting of written technical descriptions of materials,
<br /> equipment, constrUction systems, standards and workman-
<br /> ship as applied to the Work and certain administrative detaBs
<br /> applicable thereto.
<br /> Subcontractor--An individual, firm or corporation having a
<br /> direct contract with cONTRaCTOR or with any other Sub-
<br /> contractor for the performance of a part of the Work at the
<br /> site.
<br /> Substantio! Completion--The Work (or a Sl~Cified part thereoD
<br /> has progressed to the point where, in the opinion of ENGI-
<br /> NEER as evidenced by ENGINEER's definitive certificate
<br /> of Substantial Completion, it is sufficiently complete, in-
<br /> accordance with the Contract Documents, so that the Work
<br /> (or specified par0 can be utilized for the purposes for which
<br /> it is intended; or if there be no such certificate issued, when
<br /> final payment is due in accordance with paragraph 14.13. The
<br /> terms "substantially complete" and "substantially com-
<br /> pleted'' as applied to any Work refer to Substantial Comple-
<br /> tion thereof.
<br />
<br /> Supplementary Conditlonx--The part of the Contract Docu-
<br /> ments which amends or supplements these General Condi-
<br /> tions.
<br /> Supplier--A manufacturer, fabricator, supplier, distributor',
<br /> materialman or vendor.
<br />
<br /> Underground Facillties--All pipolines, conduits, ducts,'cables,
<br /> wires, manholes, vaults, tanks, tunnels or other such facilities
<br /> or attachment~, and any eneasements containing such facil-
<br /> ities which have been installed underground to furnish any of
<br /> the following services or materials: electricity, gases, ate.am,
<br /> liquid petroleum products, telephone or other commumca-
<br /> lions, cable television, sewage and drainage removal, traffic
<br /> or other control systems or water.
<br /> Unit Price Work--Work to be paid for on the basis of unit
<br /> prices.
<br /> Work--The entire completed construction or the various sep-
<br /> arately identifiable parts thereof required to he furnished
<br /> under the Contract Documents. Work is the result of per-
<br /> forming services, furnishing labor and furalshlng and incor-
<br /> poratlng materials and equipment into the construction, all
<br /> aa required by the Contract Documems.
<br /> Work Directive Change--A written directive to CONTRAC-
<br /> TOR, issued on or after the Effective Date of the Agreement
<br /> and signed by OWNER and recommended by ENGINEER,
<br />
<br /> *See Supplementary Conditions
<br />
<br />ordering an addition, deletion or revisio& in the Work, or
<br />responding to differing or unforeseen physical conditions under
<br />which the Work is to be performed as provided in paragraph
<br />4.2 or 4.3 or to emergencies under paragraph 6.22. A Work
<br />Directive Change may not change the Contract Pdce or the
<br />Contract Time, but is evidence that the parties expect that
<br />the change directed or documented by a Work Directive
<br />Change will be incorporated in a subsequently issued Change
<br />Order followitig negotiations by the parties as to its effect, if
<br />any, on the Contract price or Contract Time as provided in
<br />paragraph 10.2.
<br /> Written Amendment~A written amendment of the Contract
<br /> Documents, signed by OWNER and CONTRACTOR on or
<br /> after the Effective Date of the Agreement and normally deal-
<br /> ing with the nonengiaeering or nontechnical rather than strictly
<br /> Work-related aspects of the Contract D6cumants.
<br />
<br />· ARTICLE 2__PRELIMINARY MATYERS
<br />
<br />' Delivery of Bond~:
<br /> 2.1. When CONTRACTOR delivers the executed Agree'
<br /> ments to OWlqER, CONTRACTOR shall also deliver to
<br /> OWNER such Bonds as CONTRACTOR may be required to
<br /> furnish in accordance with paragraph 5.1.
<br />
<br />Copies of Documents:
<br /> 2.2. OWNER shall furnish to CONTRACTOR up to ten
<br />copies (unless other,vise specified in the Supplementary Con-
<br />ditions) of the Contract Documents as are reasonably nec-
<br />essary for the exeoutlor~ of the Work, Additional copies will
<br />be furnished, upon request at thc cost of reproduction.
<br />
<br />* Commencement of Contract Time; Notice to Proceed:
<br /> 2.3. The Contract Time will commence to run on the
<br /> thirtieth day after the Effective Date of the Agreement, or, if
<br /> a Notice to Proceed is given, on the day indicated in the
<br /> ~qofice to Proceed. A Notlcc to Proceed may be given at any
<br /> time within thirty days after the Effective Date of the Agree-
<br /> ment. In no event will the Contract Time commence to run
<br /> later than the seventy-fifth day after thc day of Bid opening
<br /> or the thirtieth day after the Effective Date of the A~reemcat.
<br /> whichever date is earlier.
<br />
<br />Starting the Project:
<br /> 2.4. CONTRACTOR shall start to perform the Work on
<br />the date when the Contract Time commences to run, but no
<br />Work shall be done at the site prior to the date on which the
<br />Contract Tim.e commences to run.
<br />
<br />Before Starting Construction:
<br /> 2.5. Before undertaking each part o1' {he Work. CON-
<br />TRACTOR shall carafuIly study and compare the Contract
<br />Documents and check and verify pertinent figures shown
<br />