Laserfiche WebLink
Shop Drawingx--AIl drawings, diagramS, illustrations, <br />schedules and other data ~vhlch arc specifically prepared by <br />or for CONTRACTOR to illustrate some portion of the Work <br />and all illustrations, brochures, standard schedules, perfor- <br />mance charts, instrUctions, diagrams and other information <br />prepared by a Supplier and submitted by CONTRACTOR to <br />illustrate material or equipment for some portion of the Work. <br /> Specifications--Those portions of the Contract Documents <br /> consisting of written technical descriptions of materials, <br /> equipment, constrUction systems, standards and workman- <br /> ship as applied to the Work and certain administrative detaBs <br /> applicable thereto. <br /> Subcontractor--An individual, firm or corporation having a <br /> direct contract with cONTRaCTOR or with any other Sub- <br /> contractor for the performance of a part of the Work at the <br /> site. <br /> Substantio! Completion--The Work (or a Sl~Cified part thereoD <br /> has progressed to the point where, in the opinion of ENGI- <br /> NEER as evidenced by ENGINEER's definitive certificate <br /> of Substantial Completion, it is sufficiently complete, in- <br /> accordance with the Contract Documents, so that the Work <br /> (or specified par0 can be utilized for the purposes for which <br /> it is intended; or if there be no such certificate issued, when <br /> final payment is due in accordance with paragraph 14.13. The <br /> terms "substantially complete" and "substantially com- <br /> pleted'' as applied to any Work refer to Substantial Comple- <br /> tion thereof. <br /> <br /> Supplementary Conditlonx--The part of the Contract Docu- <br /> ments which amends or supplements these General Condi- <br /> tions. <br /> Supplier--A manufacturer, fabricator, supplier, distributor', <br /> materialman or vendor. <br /> <br /> Underground Facillties--All pipolines, conduits, ducts,'cables, <br /> wires, manholes, vaults, tanks, tunnels or other such facilities <br /> or attachment~, and any eneasements containing such facil- <br /> ities which have been installed underground to furnish any of <br /> the following services or materials: electricity, gases, ate.am, <br /> liquid petroleum products, telephone or other commumca- <br /> lions, cable television, sewage and drainage removal, traffic <br /> or other control systems or water. <br /> Unit Price Work--Work to be paid for on the basis of unit <br /> prices. <br /> Work--The entire completed construction or the various sep- <br /> arately identifiable parts thereof required to he furnished <br /> under the Contract Documents. Work is the result of per- <br /> forming services, furnishing labor and furalshlng and incor- <br /> poratlng materials and equipment into the construction, all <br /> aa required by the Contract Documems. <br /> Work Directive Change--A written directive to CONTRAC- <br /> TOR, issued on or after the Effective Date of the Agreement <br /> and signed by OWNER and recommended by ENGINEER, <br /> <br /> *See Supplementary Conditions <br /> <br />ordering an addition, deletion or revisio& in the Work, or <br />responding to differing or unforeseen physical conditions under <br />which the Work is to be performed as provided in paragraph <br />4.2 or 4.3 or to emergencies under paragraph 6.22. A Work <br />Directive Change may not change the Contract Pdce or the <br />Contract Time, but is evidence that the parties expect that <br />the change directed or documented by a Work Directive <br />Change will be incorporated in a subsequently issued Change <br />Order followitig negotiations by the parties as to its effect, if <br />any, on the Contract price or Contract Time as provided in <br />paragraph 10.2. <br /> Written Amendment~A written amendment of the Contract <br /> Documents, signed by OWNER and CONTRACTOR on or <br /> after the Effective Date of the Agreement and normally deal- <br /> ing with the nonengiaeering or nontechnical rather than strictly <br /> Work-related aspects of the Contract D6cumants. <br /> <br />· ARTICLE 2__PRELIMINARY MATYERS <br /> <br />' Delivery of Bond~: <br /> 2.1. When CONTRACTOR delivers the executed Agree' <br /> ments to OWlqER, CONTRACTOR shall also deliver to <br /> OWNER such Bonds as CONTRACTOR may be required to <br /> furnish in accordance with paragraph 5.1. <br /> <br />Copies of Documents: <br /> 2.2. OWNER shall furnish to CONTRACTOR up to ten <br />copies (unless other,vise specified in the Supplementary Con- <br />ditions) of the Contract Documents as are reasonably nec- <br />essary for the exeoutlor~ of the Work, Additional copies will <br />be furnished, upon request at thc cost of reproduction. <br /> <br />* Commencement of Contract Time; Notice to Proceed: <br /> 2.3. The Contract Time will commence to run on the <br /> thirtieth day after the Effective Date of the Agreement, or, if <br /> a Notice to Proceed is given, on the day indicated in the <br /> ~qofice to Proceed. A Notlcc to Proceed may be given at any <br /> time within thirty days after the Effective Date of the Agree- <br /> ment. In no event will the Contract Time commence to run <br /> later than the seventy-fifth day after thc day of Bid opening <br /> or the thirtieth day after the Effective Date of the A~reemcat. <br /> whichever date is earlier. <br /> <br />Starting the Project: <br /> 2.4. CONTRACTOR shall start to perform the Work on <br />the date when the Contract Time commences to run, but no <br />Work shall be done at the site prior to the date on which the <br />Contract Tim.e commences to run. <br /> <br />Before Starting Construction: <br /> 2.5. Before undertaking each part o1' {he Work. CON- <br />TRACTOR shall carafuIly study and compare the Contract <br />Documents and check and verify pertinent figures shown <br /> <br /> <br />