Laserfiche WebLink
Ah - ~ Alk <br />(2) A11 collector streets vvithin the addition shall have a ninimum <br />of six (6) inches compacted thickness portland cement stabilized <br />soil base. This thickness does not include the wearing surfacea <br />The material for this base shall be the natural soil to which <br />r.nay or may not have been added gravel or sand and portland cement <br />in the amount of eight (8) to fourteen (14) per cent by volurnea <br />Specific quantity of naterial to be added shall be determined <br />by current A.S.T.I.I. test procedureo <br />(3) Arterial Streets, All arterial streets shall have nine (9) <br />inches compacted thickness of soil cement stabilized base or <br />flexiple base or portland cement concrete pavement. The flexible <br />material if selected shall meet the approval of the City Engineero <br />The soil cement stabilized material if selected shall be con- <br />structed in accordance with requirements for collector streets <br />except as to thickness. The portland cement concrete pavementt <br />if selected, shall be constructed with suitable base and design <br />for the wheel loads and traffic volumest as determined py the <br />City Engineer of the City of Paris. <br />(4) The above street bases or an approva~'`equal shall be constructed <br />in accordance with the City of Paris' standard specifications for <br />said type construction ar.d on a sub base that has been approved <br />by the City Enrineer. <br />D. Street Surfacing. <br />A11 streets vuithin the addition shall have the following ninimum street <br />surfacing or pavement placed thereono <br />(1) Local and collector streets, triple asphalt surface penetrationo <br />all materials meeting the standard State Highway Department speci- <br />fications. <br />(2) Arterial Streets, Soil cement or flexible base surfacing on <br />arterial streets shall have two (2) inches cornpacted thickness <br />of pre-mixed rock asphaltg either cold mix or an approved hot <br />r:iix o <br />A11 street paving shall be done in strict accordance with the City of <br />Paris' standard specifications for sameo <br />No street suxfacing or pavement shall be constructed until all required <br />utilities and house services (to back of curb) are in placet except gas house <br />serviceso <br />All alleys shall have xrterial Street pavenlent placed on themt except <br />where said alley is dedicated solely to provide ingress and egress to an ex- <br />isting alley, in rJhich case the alley may Yiave six (6) inches cor,ipacted yravel. <br />E. Drainage. Storm seviers, aridSes' culvertsg inlets, and drainage <br />channels or ditches of a permanent design adequate to carry off such rainfall <br />shall be installed by the subdivider throughout the entire length of the <br />drainage area where the susface drainage traverses the subdivision. The sub- <br />divider may construct in lltu of storm sevrexs suitable drainage channels which <br />shall be of sufficient vridth, depth and shape to carry off the surface <br />drainage and allovi for maintenance operations in lceeping such ditches open. <br />A11 drainaye ditches so constructed shall have their sides sloped so as to <br />retarkerosion; the flow line of said ditches shall be permanently established <br />by small low flow concrete sections3, and the panks of all curves or bends <br />shall be permanently protected to prEVent erosiono No open drainage channels <br />shall be constructed within the areas dedicated as public streets and alleys <br />in said subdivision; provided, however, that in cases where utilization of <br />the land of the i;nproved developrnent warrants otherwiset such ditches niay be <br />located in the center portion of a street (except at street intersections <br />where culverts or bridges of a permanent design shall be constructed) where a <br />rightq---of-way not less than eighty (80) feet in width plus vaidth for drainage <br />channel is providedo <br />