My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-E T-Hangar Contract Award
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
08 - August
>
August 13, 2001
>
07-E T-Hangar Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:24:25 AM
Creation date
8/10/2001 12:18:24 PM
Metadata
Fields
Template:
AGENDA
Item Number
7-E
AGENDA - Type
RESOLUTION
Description
Award Bid - T-Hangar Construction
AGENDA - Date
8/13/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEN ERA L CON DITION S ,l,:ll,ctivc--An ad. lcctive which when modifying Ihe WOrd Work <br /> <br /> Wherever used in these General Conditions or in the other has been damaged' poor' In ENGINEER"s recommends ton <br /> <br /> indicated which are applicable to both the sim, ular trod plul'i¢J <br /> thereof: ~ has been assumed by OV4NER at Substantial Completion in <br /> accordance with paragraph 14.8 or 14.10). <br /> <br /> Addend --Wr en or graph c instruments issued prior to the Dra,'it~gs--The drawings which show the character and scope <br /> opening of Bids which clarify, correc or change the bidding of the Work to be performed and which have been prepared <br /> documents or the Contract Documents. or approved by ENGINEER und are referred to in the Con- <br /> <br />Agreement--The written agreement between OWNER and <br />CONTRACTOR covering the Work to be performed; other Effecti~'e Dnte of tire Agreentettt--The date indicated in the <br /> <br />a part thereofas provided therein, is indicated it means the date on which the Agreement is <br /> signed and delivered by the last of the two parties to sign and <br />Applicntion for Paynlent--The form accepted by ENGI- deliver. <br />NEER which is to be used by CONTRACTOR in requesting <br />progress or final payments and which is to include such sup- ENGINEER--The person, firm or corporation named as such <br />porting documentation as is required by the Contract in the Agreement. <br /> <br /> Field Order--A written order issued by ENGINEER which <br />Bid--The offer or proposa{ of the bidder submitted on the orders minor changes in the Work in accordance with para- <br />prescribed form setting forth the prices for the Work to be graphg. Sbut which does not involve a ehange in the Contract <br />performed. Price or the Contract Time. <br /> <br />instruments of security, fications. <br /> <br />Change Order--A document recommended by ENGINEER, Laws and Regulations: Laws or Regulations--Laws, rules, <br />which is signed by CONTRACTOR and OWNER and autho- regulations, ordinances, codes and/or orders. <br />rizes an addition, deletion or revision in the Work, or an <br />adjustmentinth¢Contraet Priceor theContractTime,issued Notice of Award--The written notice by OWNER to the <br />on or after the Effective Date of the Agreement. apparent successful bidder stating that upon compliance by <br /> the apparent successful bidder with the conditions precedent <br />Contract Documents--The Agreement, Addenda (which per- enumerated therein, within the time specified, OWNER wi{I <br />rain to the Contract Documents), CONTRACTOR's Bid sign and deliver the Agreement. <br />(including documentation accompanying the Bid and any post- Notice to Proceed.--A written notice given by OWNER to <br />Bid documentalion submitted prior to the Notice of Award) CONTRACTOR (with a copy to ENGINEER) fixing the date <br />when attached as an exhibit to the Agreement, the Bonds, on which the Contract Time w/l{ commence to run and on <br />theseGeneralConditions, theSupplementaryConditions, the which CONTRACTOR shall start to perform CONTRAC- <br />Specifications and the Drawings as the same are more spe- TOR'S obligations under the Contract Documents. <br />cifically identified in the Agreement. together with all amend- <br />ments, modifications and supplements issued pursuant to OWNER--The public body or authority, corporatio'n, sase- <br />paragraphs 3.4 and 3.5 on or after the Effective Date of the rial{on, firm ~r person with whom CONTRACTOR has entered <br />Agreement. into the Agreement and for whom the Work is to be provided. <br /> <br />Contract Price--The moneys payable by OWNER to CON- Partial Utilization--Placing a porlion of the Work in service <br />TRACTOR under the Contract Documents as stated in the for the purpose for which it is intended (or a related purpose) <br />Agreement (subject to (he provisions of paragraph 11.9.1 in before reaching Substantial Completion for al{ the Work. <br />the case of Unit Price Work). <br /> Project--The total construction of which the Work to be <br />Contract Time--The number of days (computed as provided provided under the Contract Documents may lac tho whole, <br />in paragraph 17.~) or the date stated in the Agreement for the or a part as indicated elsewhere in the Contract Documents. <br />comp[etlon of the Work. <br /> Resident Project Representative--The authorized rep~'esen- <br />CONTRACTOR~The person, firm or corporation with whom tative of ENGINEER who is assigned to the site or any part <br />OWNER has entered into thc Agreement. lhereof. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.