Laserfiche WebLink
Shop Drawings--All drawings, die. grams, illustrations, ordering an addition, deletion or rcvisiofi in the Work, or <br />schedules and other data which arc specifically prepared by responding to differing or nnforeseen physical conditions under <br />or for CONTRACTOR to illustrate some portion of the Work which the Work is to be performed as provided in pa~'agmph <br />and all illustrations, brochures, standard schedules, pcrfor- 4.2 or 4.3 or to emergencies under paragraph 6.22. A Work <br />mance charts, instructions, diagrams and other information Directive Change may not change the Contract Price or the <br />prepared by a Supplier and submitted by CONTRACTOR to Contract Time, but is evidence that the parties expect that <br />illustra~ematerialorequipmentforsomeporfionoftheWork, the change directed or documented by a Work Directive <br /> Change will be incorporated in a subsequently issued Change <br />Specifications--Those portions of the Contract Documents Order following negotiations by the parties as to its effect, if <br />consisting of written technical descriptions of materials, any, on thc Contract Price or Contract Time as provided in <br />equipment, construction systems, standards and workman- paragraph 10.2. <br />ship as applied to the Work and certain administrative details <br />applicable thereto. Wr#ten Amendment--A written amendment of the Contract <br /> Documents, signed by OWNER and CONTRACTOR on or <br />Subcontractor--An individual, firm or corporation having a after the Effective Date of the Agreement and normally deal- <br />direct contract with CONTRACTOR or with any other Sub- ing with the noneagineedng or nontechnical rather than strictly <br />contractor for the performance of a part of the Work at the Work-related aspects of the Contract Documents. <br />site. <br /> <br />SubstantialCompletion--The Work (or a specffied part thereof) <br />has progressed to the point where, in the opinion of ENGI- ARTICLE 2--PRELIMINARY MATTERS <br />NEER as evidenced by ENGINEER's definitive certificate <br />of Substantial Completion, it is sufficiently complete, in DellveryofBonds: <br />accordance with the Contract Documents, so that the Work <br />(or ~pecified part) can be utilized for the purposes for which 2. I. When CONTRACTOR delivers the executed Agree- <br />it is intended; or if there be no such certificate issued, when ments to OWNER, CONTRACTOR shall also deliver to <br />final payment is due in accordance with paragraph 14.I% The OWNER such Bonds as CONTRACTOR may be required to <br />terms "substantially complete" and "substantially corn- furnish in accordance with paragraph 5.I. <br />pleted" as applied to any Work refer to Substantial Comple- <br />tion thereof. Copies of Documents: <br />Supplementer), Condition$~The part of the Contract Docu- 2.2. OWNER shall furnish to CONTRACTOR up to ten <br />merits which amends or supplements these General Condi- copies (unless otherwise specified in the Supplementary Con- <br /> ditions) of the Contract Documents as are reasonably nee- <br />lions, essary for the execution' of the Work. Additional copies will <br />Supplier--A manufacturer, fabricator, supplier, dlstributo, r, b~ furnished, upon request, at the cost of reproduction. <br />materialman or vendor. <br /> * Commencement of Contract Time; Notice to Proceed: <br />Underground Facilltie$--All pipelines, condults,ducts,'cables, 2.3. The Contract Time will commence to run on the <br />wires, manholes, vaults, tanks, tunnels orother such facilities thirtieth day after the Effective Date of the Agreement, or, if <br />or attachments, and any eucascments containing such fac[l- a Notice to Proceed is given, on the day indicated in the <br />it[es which have been installed underground to furnish any of ~loticc to Proceed. A Notice to Proceed may be given at any <br />the following services or materials: electricity, gases, steam, time within thirty days after the Effective Date of the Agree- <br />liquid petroleum products, telephone or other communion- mem. In no event will the Contract Time commence to run <br />lions, cable television, sewage and drainage removal, traffic later than the seventy-fifth day after the day of Bid op~ning <br />or other control systems or water, or the thirtieth day after thc Effective Date of th~Agraement. <br /> whichever date ia earlier. <br />Unit Pdce Work--Work to b¢ paid for on ~he basis of unit <br />ptlces. Starflng the Project: <br />Work--Thccntirecompletedcoustructionorthevarioussep' 2.4. CONTRACTOR shall start to perform the Work on <br />arately identifiable parts thereof required to be furnished the date when the Contract Time commences to run, but no <br />under the Contract Documents. Work is the result of per- Work shall be do'ne at the site prior to the date on which the <br />forming services, furnishing labor and furnishing and incor- Contract Time commences to ran. <br />l~arafing materials and equipment into the construction, all <br />as required by the Contract Documents. <br /> Before Staffing Construction: <br /> <br />Work Directive Chenge--A written directive to CONTRAC- 2.5. Before undertaking each part of the Work, CON- <br />TOR, issued on or after the Effective Date of thc Agreement TRACTOR shall carefully study and compare the Contract <br />and s~gned by OWNER and rocommcndcd by ENGINEER, Documents and check and verify pertinent figures shown <br /> <br />*See Supplementary Cond/tfons 3'6 <br /> <br /> <br />