My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-E T-Hangar Contract Award
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
08 - August
>
August 13, 2001
>
07-E T-Hangar Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:24:25 AM
Creation date
8/10/2001 12:18:24 PM
Metadata
Fields
Template:
AGENDA
Item Number
7-E
AGENDA - Type
RESOLUTION
Description
Award Bid - T-Hangar Construction
AGENDA - Date
8/13/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
thereon and all applicable field measurements. CONTRAC- graph 2.6. The finalized progress schedule ',viii be acceptable <br />TOR shall promptly report in ,.vdting to ENGINEER any to ENGINEER as providing an orderly progression of <br /> tile <br />conflict, error or discrepancy which CONTRACTOR ma}' Work to completion within thc Contract Time, hut such <br />discover and shall obtain a written interpretation or cladfi- acceptancewillneitherimpos¢on ENGINEERresponsibillt¥ <br />cation from ENGINEER before proceeding with any Work for the progress or scheduling of the Work nor relieve CON- <br />affected thereby; however, CONTRACTOR shall not be fia- TRACTOR from full responsibility there[or. The finalized <br />hie to OWNER or ENGINEER for failure to report any schedule of Shop Drawing submissions will be acceptable to <br />conflict, error or discrepancy in the Contract Documents, ENGINEER as providing a workable arrangement for pro- <br />unIess CONTRACTOR had actual knowledge thereul'or should cessing the submissions. The finalized schedule of values will <br />reasonably have known thereof, be acceptable to ENGINEER as to form and substance. <br /> <br />2.6. Within ten days after the Effective Date of the Agree- <br />ment (unless otherwise specified in the General Require- ARTICLE 3--CONTRACT DOCUMENTS: INTENT, <br />merits), CONTRACTOR shall submit to ENGINEER for AMENDING, REUSE <br />review; <br /> <br /> 2.6.1. an estimated progress schedule indicating the Intent: <br /> starting and completion dates of the various stages of the 3. I. The Contract Documents comprise the entire .agree- <br /> Work; merit between OWNER and CONTRACTOR concerning the <br /> Work. The Contract Documents are complementary; what is <br /> 2.6.2. a preliminary schedule of Shop Drawing sub- called for by one is as binding as if called for by alt. The <br /> missions; and Contract Documents will be construed in accordance with <br /> the law of the place of the Project· <br /> 2.6.3. a preliminary schedule of values for ail of the <br /> Work which wiff include quantifies and prices of items * 3.2. It is the intent of the Contract Documents to describe <br /> aggregatingtheContract Priceandwillsubdividethe Work a functionally complete Project (or part thereol) to be con- <br /> into component parts in sufficient detail to serve as the stt:ucted in accordance with the Contract Documents. Any <br /> basis for progress tmyments during construction. Such Work, materials or equipment that may reasonably be inferred <br /> prices will include an appropriate amount of overhead and from the Contract Documents as being required to produce <br /> profit applicable to each item of Work which will be con- whether <br /> the <br /> intended <br /> result <br /> will <br /> be <br />timed in writing by CONTRACTOR at the time of sub- called for. When words which have a well-known technical <br />mission, or trade meaning are used to describe Work, materials or <br /> equipment such words shall be interpreted in accordance with <br />2.7. Before any Work at the site is started, CONTRAC- that meaning. Reference to standard specificatlotis, manuals <br />TOR shall deliver to OWNER, with a copy to ENGINEER, or codes of any techmcal society, organization or assoulat'on, <br />certificates (and other evidence of insurance requested by or to the Laws or Regulations of any governmental authority, <br />OWNER) whichCONTRACTORisrequiredto porchaseand whether such reference be specific or by implication, shall <br />maintain in accordance with paragraphs 5.3 and 5.4, and mean the latest standard specification, manual, code or Laws <br />OWIqER shall deliver to CONTRACTOR certificates (and or Regulations in effect at the time of opening of Bids (or, on <br />other evidence of insurance requested by CONTRACTOR) the Effective Date of the Agreement if there were no Bids), <br />which OWNER is required to purchase and maintain in except as may be otherwise specifically stated. However, no <br />accordance with paragraphs 5.6 and 5.7. provision of any referenced standard specification, manual <br /> orcode (whetheror not specifically incorporated by reference <br /> in the Contract Documents) shall be effective to change the <br />Preconstruction Conference: duties and responsibilities of OWNER, CONTRACTOR or <br /> 2.8. Within twenty days after the Effective Date of thc ENGINEER, of their consultants, agents or employ- <br /> or <br />Agreement, but before CONTRACTOR starts thc Work at ecs from those set forth in thc Contract Documents, nor sha![ <br />the site, a conference attended by CONTRACTOR, ENGI- it be effective to assign to ENGINEER, or any of ENGI- ' <br />NEER and others as appropriate will be held to discuss the NEER's consultants, agents or employees, any duty or <br />schedules referred to in paragraph 2.6, to discuss procedures authority to supervise or direct the furnishing or performance <br />for handling Shop Drawings and other submittals and for of the Work or any duty or authority to undertake responsi- <br />processlagApplicatiansforPayment,andtoestablishaworking bility coutrkry to the provisions of paragraph 9.15 or 9.16. <br />understanding among the parties as to the Work. Clarifications and interpretations of the Contract Documents <br /> shall be issued by ENGINEER as provided in paragraph 9.4. <br /> <br />Finalizlng$chedtdes: 3.3. If, during the performance of tbe Work, CONTRAC- <br />2.9. AtleaattendaysbeforcsubmlsslonofthefirstAppli- TON finds a conflict, error or discrepancy'in thc Contract <br />cation for Payment a conference attended by CONTRAC- Documents, CONTRACTOR shall so report to ENGINEER <br />TOR, ENGINEER and others as appropriate will be held to in writingat once and befog proceedingwith theWorkaffected <br />finalize the schedules submitted in accordance with para- thereby shall obtain a written interpretation or claritlcatlon <br /> <br />· See Supplementary Conditions <br /> 37 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.