Shop Drawings will be delivered to F,.*NGIN EER for O\VNER. -~
<br /> 6 .... In emergencies affecting the safety or protection of
<br />
<br /> CONTRACTOR. without special instruction or authorization
<br />Safety andProteetion: from ENGINEER or OWNER, is obligated to act to prevent
<br /> threatened damage, injury or loss. CONTRACTOR shall give
<br />*6.20. CONTRACTOR shall be responslble for initiating. ENGINEERpromptwrittennoticeifCONTRACTORbelicves
<br />maintaining and supervising all safety precautions and pro- that any significant changes in the Work or variations from
<br />grams in connection with the Work. CONTRACTOR shall the Contract Documents have been caused thereby. If ENGI-
<br />take all necessary precautions for the safety of, and shall NEER determines that a change in the Contract Documents
<br />provide the necessa~' protection to prevent damage, injury is required because of Ihe action taken in response to an
<br />or loss to: emergency, a Work Directive Change or Change Order will
<br /> be issued to document the consequences of the changes or
<br />6.20.1. all employees on the Work and other persons variations.
<br />and organizations who may be affected thereby;
<br />
<br /> 6.20.2. all the Work and materials and equipment to 5hopOra~qngsandSara£1es:
<br /> be incorporated therein, whether in storage on or off the 6.23. After checking and verifying all field measurements
<br /> site; and and after complying with applicable procedures specified in
<br /> the General Requirements, CONTRACTOR shall submit to
<br /> 6.20.3. other property at the site or adjacent thereto, ENGINEER for review and approval in accordance with the
<br /> including trees, shrubs, lawns, walks, pavements, road- accepted schedule of Shop Drawing submissions (see para-
<br /> ways, structures, utilities and Underground Facilities not graph 2.9), or for other appropriate action if so indicated in
<br /> designated for removal, relocation or replacement in the the Supplementary Conditions, five copies (unless otherwise
<br /> course of construction, specified in the General Requirements) of all Shop Drawings,
<br /> which will bear a stamp or specific written indication that
<br /> CONTRACTOR shall comply with all appficable Laws and CONTRACTOR has satisfied CONTRACTOR's responsio
<br /> Regulations of any public body having jurisdiction for the bilities under the Contract Documents with respect to the
<br /> safety of persons or propertyor to protect them ffomdamage, review of the submission. All submissions will be identified
<br /> injury or loss; and shall erect and maintain all necessary as ENGINEER may require. The data shown on the Shop
<br /> safeguards for such safety and protection. CONTRACTOR Drawings will be complete with respect to quantities, dimen-
<br /> shall notify owners of adjacent property and of Underground signs, specified performance and design criteria,- materials
<br /> Facilities and utility owners ,.,,'hen prosecution of the Work and similar data to enable ENGINEER to review the infor-
<br /> may affect them. and shall cooperate with them in the pro- marion as required.
<br /> tection, removal, relocation and replacement of their prop-
<br /> erty. All damage, injury or loss to any property referred to 6.24. CONTRACTOR shall also submit to ENGINEER
<br /> in paragraph 6.20.2 or 6.20.3 caused, directly or indirectly, for review and approval with such promptness as to cause
<br /> in whole or in part, by CONTRACTOR, any Subcontractor, no delay in Work, all samples required by the Contract Doc-
<br /> Supplier or any other person or organization directly or indi- uments. All samples will have been checked by and accom-
<br /> reedy employed by any of them to perform or furnish any of panied by a specific written indication that CONTRACTOR
<br /> theWorkoranyoneforwhoseactsanyo['themmaybcliable, has satisfied CONTRACTOR's responsibilities under the
<br /> shall be remedied by CONTRACTOR (except damage or loss Contract Documents with respect to the review of the sub-
<br /> attributable to the fault of Drawings or Specifications or to mission and will be identified clearly as to material, Supplier.
<br /> the acts or omissions of OWNER or ENGINEER or anyone pertinent data such as catalog numbers and the use for which
<br /> employed by either of them or anyone for whose acts either intended.
<br /> of them may be liable, and not attributable, directly or indi-
<br /> rectly, in whole or in part, to the fault or negligence of CON- 6.25.1. Before submission of each Shop Drawing or
<br /> TRACTOR). CONTRACTOR's duties and responsibilities sample CONTRACTOR shall have determined and veri-,
<br /> for the safety and protection of the Work shall continue until fled all quantities, dimensions, specified performance cfi-
<br /> such time as all the Work is completed and ENGINEER has terla, installation requirements, materials, catalog hum-
<br /> issued a notice to OWNER and CONTRACTOR in accord- hers and similar data with respect thereto and reviewed
<br /> ance with paragraph 14.13 that the Work is acceptable (except or coordinated each Shop Drawing or sample with other
<br /> as otherwise expressly provided in connection with Substan- Shop Drawings and samples and with the requirements of
<br /> rial Completion). the Work and the Contract Documents.
<br />
<br /> 6.21. CONTRACTOR shall designate a responsible rep- ' '6.25.2. 'At the time of each submission. CONTRAC-
<br /> resentative at the site whose duty shall be the prevention of TOR shall give ENGINEER specific written notice of each
<br /> accidents. This person shall be CONTRACTOR's superin- variation that thc Shop Drawings or samples may have
<br /> tendent unless otherwise designated in writing by CON- from the requirements of thc Contract Documents. and.
<br /> TRACTOR to OWNER. in addition, shall cause a specific notation to be made on
<br />
<br /> *See Supplementary Conditions 45