Laserfiche WebLink
each Shop Drawing submiued to ENGINEER for review provided that any such claim, damage, loss or expense fa) is <br />and approval of each such variation. _'t attributable IO bodily injury, sickness, diseuse or death, or to <br /> injury to or destruction of tangible property {other than the <br />6.26. ENGINEER will review and approve with reason- Work itself) including the loss of use resulting d~erefrom and <br />able promptness Shop Drawings and samples, but ENGI- (b) is caused in whole or in part by any negligent act or <br />NEER's review and approval will be only for conformance omission of CONTRACTOR, any Subcontractor, any person <br />with the design concept of the Project and for compliance ororganizationdirecdyorindirectlyemployedbyanyofthem <br />with the information given in the Contract Documents and in perform or furnish any of the Work or anyone for whose <br />shall not extend to means, methods, techniques, sequences acts any of them may be liable, regardless of whether or not <br />or procedures of construction (except where a specific means, it is caused in part by a party indemnified hereunder or arises <br />method, technique, sequence or procedure of construction is by or is imposed by Law and Regulations regardless of the <br />indicated in or required by the Contract Documents) or to negligence of any such party. <br />safety precautions or programs incident thereto. The review <br />and approval of a separate item as such will not indicate 6.31. In any and all claims against OWNER or ENGI- <br />approval of the assembly in which the item functions. CON- NEER or any of their consultants, agents or employees by <br />TRACTOR shall make corrections required by ENGINEER, any employee of CONTRACTOR, any Subcontractor. any <br />and shall return the required number of corrected copies of person or organization directly or indirectly employed by any <br />Shop Drawings and submit as required new samples for review of them to perform or furnish any of the Work or anyone for <br />and approval. CONTRACTOR shall direct specific attention whose acts any of them may be liable, the indemnification <br />in writing to revisions other than the corrections called for obligation under paragraph 6.30 shall not be limited in any <br />by ENGINEER on previous submittals, way by any limitation on the amount or type of damages, <br /> compensation or benefits payable by or for CONTRACTOR <br />6.27. ENGINEER's review and approval of Shop Draw- or any such Subcontractor or other person or organization <br />ings or samples shall not relieve CONTRACTOR from under workers' or workmen's compensation acts, disability <br />responsibility for any variation from the requirements of the benefit acts or other employee benefit acts. <br />Contract Documents unless CONTPOLCTOR has in writing <br />called ENGINEER's attention to each such variation at the 6.32. The obligations of CONTRACTOR under para- <br />time of submission as required by paragraph 6.25.2 and graph 6.30 shall not extend to the liability of ENGINEER, <br />ENGINEER has given written approval of each such varia- ENGINEER's consultants, agents or employees arising out <br />lion by a specific written notation thereof incorporated in or of the preparation or approval of maps, drawings, opinions, <br />accompanying the Shop Drawing or sample approval; nor reports, surveys, Change Orders, designs or specifications. <br />will any 'approval by ENGINEER relieve CONTRACTOR <br />from responsibility for errors or omissions in the Shop Draw- <br />ings or from responsibility for having complied with the pro- ARTICLE 7--OTHER WORK <br />visions of paragraph 6.25.1. <br /> <br />6.28. Where a Shop Drawing or sample is required by the Related Work at Site: <br />Specifications, any related Work performed prior to ENGI- 7.1. OWNERmayperformotherworkrelatedtotheProj- <br />NEER'sreviewaadapprevalofthepertinentsubmissionwill ecl at the site by OWNER's own forces, have other work <br />bethesoleexpenseandresponsibilityofCONTRACTOR, performed by utility owners or let other direct contracts therefor <br /> which shall contain General Conditions similar to these. If <br /> the fact that such other work is to be performed was not noted <br />Contlnulngthe ~¥ork: in the Contract Documents. written notice thereof will be <br />6.29. CONTRACTOR shall carry on the Work and adhere given to CONTRACTOR prior to starting any such other <br />to the progress schedule during all disputes or disagreements work; and, if CONTP,.ACTOR believes that such peffor- <br />with OWNER. No Work shall be delayed or postponed pond- maoce will involve additional expense to CONTRACTOR or <br />lng resolution of any disputes or disagreements, except as requires additional time and the parties are unable tO agree <br />permitted by pamuaph 15.5 or as CONTRACTOR and as to the extent thereof, CONTRACTOR may make'a claim <br />OWNER may otherwise agree in writing, therefor as provided in Articles 11 and 12. <br /> <br /> 7.2. CONTRACTOR shall afford each utility owner and <br />'Indemnification: other contractor who is a party to such a direct contract (or <br />6.30. To the fullest'extent permitted by Laws and Regu- OWNER, if OWNER is performing the additional work with <br />lations CONTRACTOR shall indemnify and hold harmless OWNER's employees) proper and safe access to the site and <br />OWNER and ENGINEER and their consultants, agents and a reasonable opportunity for the introduction and storage of <br />employees from and against all claims, damages, losses and materials and equipment and the execution of such work, and <br />expenses, direct, indirect or consequential (including but not shall properly connect and coordinate the Work with theirs. <br />limlted tdfees and chargesofenglneers, arohitects, attomeys CONTRACTOR shall do all cutting, fitting and patching of <br />and other professionals and court and arbitration costs) aris- the Work that may be required to make its several parts come <br />ing out of or resulting from the performance of the Work, together properly and integrate with such other work. CON- <br /> <br /> *See Supplementary Conditions 46 <br /> <br /> <br />