My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-E T-Hangar Contract Award
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
08 - August
>
August 13, 2001
>
07-E T-Hangar Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:24:25 AM
Creation date
8/10/2001 12:18:24 PM
Metadata
Fields
Template:
AGENDA
Item Number
7-E
AGENDA - Type
RESOLUTION
Description
Award Bid - T-Hangar Construction
AGENDA - Date
8/13/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and tl~c olhcrs whose work will bc affected. Thc duties and 8.5. OWNER's responsibilities in respect o£ <br />rcsponsibilitics of CONTRACTOR under [his paragraph arc und maintaining liability and propcmy insurance nrc scl <br />for thc benefit of such u~ility owners and oJhcr conlmctors in ps,graphs 5.5 through 5.8. <br /> <br />benefit orCONTRACTOR in said dirccl contracts between 8.6. OWNER is obligated t0 execute Chan~c Orders as <br />OWNER and such util[ty owners and other contrac:ors, indicated in paragraph 10.4. <br /> <br /> 8.7. OWNER's rcsponsibilky in respect o[ certain <br /> 7.3. I[ any p~n of CONTRA~OR's Work depends tot <br /> <br />contractor or util{ty owner (or OWNER), CONTRA~OR <br />shall inspect and promptly repo~ Io ENGINEER in writing 8.8. In connection ~v[th OWNER's right to stop Work or <br /> suspend Work, see paragraphs 13. I 0 and I S.[. Paragraph I 5.2 <br />any delays, defects or deficieocies in such work that render deals with OWNER's Hght to terminate se~ccs of CON- <br />it unavailable or unsuitable ~or such proper execution and TRA~OR under c¢~ain circumstances. <br />results. CONT~CTOR's failure so to repo~ will constitute <br />an acceptance of thc other work as fit and proper for integra- <br />tion with CONT~OR's Work except for talent or non- <br />apparent derects and defic{encies in ~he othar wo~. ARTICLE 9~ENGINEER'S ~ATUS DURING <br /> CON~RU~ION <br /> <br /> Coordination: ;~ <br /> <br /> 7.4. It' OWNER contracts with others for the pertor- Owner'.~Representatlve: <br /> <br /> mance of other work on the Project at the site. the person or 9.1. ENGINEER will be OWNER's representative dar- <br /> organization who will have authority and responsibility for ing the construction period. The duties and responsibilities <br /> coordination or' thc activities among the various prime con- and the limitations or'authority of ENGINEERas OWNER's <br /> tractors will be identified in the Supplementary Conditions, representative during construction are set forth in the Con- <br /> and the specific matters to be covered by such authority and tract Documents and shall not be extended without written <br /> responsibility will be itemized, and the extent of such author- consent of OWNER and ENGINEER. <br /> try and responsibilities will be provided, in the Supplementary <br /> Conditions. Unless otherwise provided in the Supplementary Vblts to Site: <br /> Conditions, neither OWNER nor ENGINEER shall have any <br /> authority or responsibility in respect of such coordination. 9,2. ENGINEER will make visits to the site at intervals <br /> appropriate to the various stages of construction to observe <br /> the progress and quality of the executed Work and to. deter- <br /> mine, in general, if the Work is proceeding in accordance <br /> ARTICLE g~OWNER'S RESPONSIBILITIES .with the Contract Documents. ENGINEER will not be required <br /> to make exhaustive or continuous on-ske inspections to check <br /> 8.1. OWNER shall issue all communications to CON- the quality or quantity of the Work. ENGINEER's efforts <br /> TRACTOR through ENGINEER. will be directed toward providing ['or OWN ER a greater deg'cee <br /> of confidence that the completed Work will conform to the <br /> 8.2. In case of termination of the employment o[' ENGI- Contract Documents. On the basis of such visits and on-site <br /> NEER, OWNER shall appoint an engineer against whom observations as an experienced and qualified design profes- <br /> CONTRACTOR makes no reasonable objection, whose sta- sional, ENGINEER will keep OWHER int'ormed or'the prog- <br /> tus under the Contract Documents shah be that or'the former tess of the Work and will endeavor to guard OWNER against <br /> ENGINEER. Any dispute in connection with such appoint- defects and deficiencies in the Work. <br /> ment shah be subject to arb[tratlon. <br /> 8.3. OWNER shall furnish tbe data required of OWNER ProjectRepresentatlon: <br /> undertheContractDocumentspromptiyandshallmakepay- * 9.3. If OWNER and ENGINEER agree, ENGINEER <br /> ments to CONTRACTOR promptly lifter they are due as wi[[ furnish a Resident ProjeCt Representative to assist <br /> provided in paragraphs 14.4 and 14.13. ENGINEER in observing the performance of'the Work. The <br /> duties, responsibilities and limitations of authority o[' any <br /> 8.4. OWNER's duties in respect of providing lands and such Resident Project Representative and assistants wi[[ be <br /> easements and providing cngineering surveys to establish as provided in the Supplementary Conditions. If OWNER <br /> reference points are set forth in paragraphs 4. [ and 4.4. Para- designates another agent to represent OWN ER at' the site <br /> graph 4.2 refers to OWNER's [dentifylng and making avail- who is not ENGINEER's agent or employee, the duties. <br /> ab[etoCONTKACTORcopiesofrcportso['cxplorationsand responsibl[ities and limitat[ons of authority ot' such other <br /> tests ofsubsua'ace conditions at the slte and in existing strnc- person will be as provided in the Supplementary Con~itioas. <br /> · See Supplementary Conditions 47 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.