My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-E T-Hangar Contract Award
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
08 - August
>
August 13, 2001
>
07-E T-Hangar Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:24:25 AM
Creation date
8/10/2001 12:18:24 PM
Metadata
Fields
Template:
AGENDA
Item Number
7-E
AGENDA - Type
RESOLUTION
Description
Award Bid - T-Hangar Construction
AGENDA - Date
8/13/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.8 PROJECT CONDITIONS <br /> <br /> A. Weather Limitations: Proceed with installation only when weather conditions permit roof and <br /> wall panel installation to be performed according to manufacturer's written instructions and war- <br /> ranty requirements. <br /> <br /> B. Field Measurements: Verify metal building system foundations by field measurements before <br /> metal building fabrication and indicate measurements on Shop Drawings. Coordinate fabrica- <br /> tion schedule with construction progress to avoid delaying the Work. <br /> <br /> 1.9 COORDINATION <br /> <br /> A. Coordinate size and location of concrete foundations and casting of anchor-bolt inserts into <br /> foundation walls and footings. Concrete, reinforcement, and formwork requirements are speci- <br /> fied in Specification 03300 "Cast-in-Place Concrete." <br /> <br /> 1.10 WARRANTY <br /> <br /> A. General Warranty: Special warranties specified in this Article shall not deprive Owner of other <br /> rights Owner may have under other provisions of the Contract Documents and shall be in addi- <br /> tion to, and run concurrent with, other warranties made by Contractor under requirements of the <br /> Contract Documents. <br /> <br /> B. Special Warranty on Panels: Written warranty, executed by manufacturer agreeing to repair or <br /> replace roof and wall panels that fail in materials or workmanship within specified warranty pe- <br /> riod. <br /> 1. Warranty Period: Three years from date of Substantial Completion. <br /> <br /> C. Special Warranty on Panel Finishes: Written warranty, signed by manufacturer agreeing to re- <br /> pair finish or replace metal panels that show evidence of deterioration of factory-applied fin- <br /> ishes within specified warranty period. Deterioration of finish includes, but is not limited to, <br /> color fade, chalking, cracking, peeling, and loss of film integrity. <br /> 1. Warranty Period for Roof Panels: 20 years from date of Substantial Completion. <br /> 2. Warranty Period for Wall Panels: 20 years from date of Substantial Completion. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.1 MANUFACTURERS <br /> <br /> A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering <br /> products that may be incorporated into the Work include, but are not limited to, the following: <br /> 1. Behlan Mfg. Co. <br /> 2. Erect-A-Tube, Inc. <br /> 3. Fulfab, Inc. <br /> 4. R & M Steel Company <br /> 5. Alliance Steel <br /> <br />2.2 STRUCTURAL FRAMING <br /> <br /> A. Primary structural framing shall be main load carry structural members. They shall include <br /> door trusses, rafters, interior columns, and exterior columns. <br /> <br />City of Paris, Texas 13125 - 5 T-Hangar Building <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.