My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-B Comprehensive Plan
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
08 - August
>
August 13, 2001
>
02-B Comprehensive Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 11:10:16 AM
Creation date
6/18/2001 8:31:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
2-B
AGENDA - Type
STUDY
Description
Comprehensive Master Plan
AGENDA - Date
8/13/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan, City of Paris, Texas <br />Municipal Services and Natural Features <br />industrial deveIopment (especially for aviation and other transportation industries). The Indus- <br />trial/ Executive Aiipark layout on the airport includes 8,8001inear feet of taxiway/ramp access. <br />Utilities such as sewage services, electricity, etc., are readily available in the airport vicinity. <br />Cox Field-Paris provides unrestricted air access and is adjacent to U.S. Highway 271 and other <br />transportation services. <br />MUNICIPAL CODE ENFORCEMENT <br />Dangerous Structures and Code Enforcement Activity <br />The City of Paris Code Enforcement Department reports the following activities during a four <br />year period. <br />Four Year Period from 1995 through 1998. <br />Structures 1995-1998 <br />Presented To Council <br />223 <br />Condemned * <br />158 <br />Demolished <br />126 <br />Extended for repair or demolition <br />64 <br />Cost for demolition <br />$ 107,574.00 <br />Cost for landfill <br />$ 44,357.00 <br />Cost for containers <br />$ 2,640.00 <br />Cost for Grinder <br />$ 4,500.00 <br />Structures scheduled for demolition ($2,500 per structure) as of 1998: 51 <br />Mowing of Lots: 1995-1998 <br />Number of mowings 3,676 <br />Cost $ 111,745.00 <br />Lots on list 802 <br />Mowed regularly 608 <br />(**Approximately 50-75 lots are added annually to be mowed.) <br />Lots cleaned 1995-1998 <br /># Cleaned 40 <br />Cost $13,957.00 <br />5A98288\WPC\final report 2-0 l.doc 27 BWR <br />
The URL can be used to link to this page
Your browser does not support the video tag.