Laserfiche WebLink
In the event the Engineer's opinion of the probable <br />construction or Project Cost is exceeded by con-_ <br />struction bids or project overruns, the Owner shall <br />authorize._the necessary funding required by the <br />Project, at his expense revise the project scope, <br />or both as necessary, to reduce the cost as required. <br />7.3.7 The Engineer shall take reasonable affirmative 4ction <br />to strive for the use of at least 14% of Minority <br />Business Enterprise subcontractors on this Project. <br />However, rhis obligation shall be limited to the <br />economic availability of qt.ialified MBE firms, <br />Article 8; U.S. Environmental Protection A ency <br />Attached hereto, and made a part hereof, is "Appendix <br />C-1, RPquired Provisions - Consulting Engineering <br />Agreement", as required by the United State Environ- <br />mental Protection Agency. <br />This Agreement executed the day and year written at <br />the beginning of the Agreement. <br />OWNER: <br />THE CITY OF PARIS <br />LAMAR COUNTY, TEXAS HAYTER ENGIrIEERING, INC, <br />By <br />Mayor <br />BY ~ <br />residen <br />P.O. Box 1037 <br />Par is , Texas 75460 <br />ATTEST: <br />4445 S.E. Loop 2$6 <br />Paris, Texas 75460 <br />WITNE$SED: <br />_ ~ ~ ~ , R <br />J------- <br />-15- <br />