Proiect Schedule <br />Item <br />STEP 1 , <br />A. Infiltration/Inflow Analysis <br />(with Evaluation Survey Plan of Study if <br />required) completed & subnu_tted to State <br />after Step 1 grant award. <br />Cal.endar Days <br />NA-- days <br />P. Infiltration/Inflow Evaluation Survey (if <br />required) completed & submitted to State Complete aays <br />after grant amendment for Survey. <br />C. Application for taaste Control <br />Permit (if required) made no later than 120 days <br />after Public Hearing notice for Facility_ <br />Plan is issued. <br />D. Final Environmental Assessment and <br />Facility Plan (including time for draft <br />reports, advertisement & hearing) <br />completed and submitted to the State 395 days <br />after Step 1 grant amendment award. <br />STEP 2 ' <br />A. User Charge System and Industrial <br />Cost Recovery System (if required) <br />developed and submitted to the State 365 days <br />after Step 2 grant award. <br />B. Preliminary Plan of Operation (if required) <br />completed and submitted to the State 365 days <br />after Step 2 grant award. <br />C. Final Plans and Specifications, <br />completed and submitted to State 5~8 days <br />after Step 2 grant award. <br />STEP 3 <br />A. Advertise for Construction Bids within 30 days <br />after authorization to advertise for <br />bids has been issued. <br />B. Submit Bid Opening Documents within 105 days <br />after authorization to advertise for <br />bids has been i.ssued. <br />C. Award of Construction Contract within 3(,) days <br />after authorization to award the contract <br />has been issued. <br />D. Initiation of- Construction within 60 days <br />after the award of the contract. <br />F. Complete Constructior_ within 730 days <br />after inztiation of construction. <br />EXHIBIT A <br />