1956 RES CITY COUNCIL IN RES NO 1675 PASSED ON 24TH DAY OF MARCH 1975 ADOPTED PROJECT SCHEDULE FOR INFILTRATION/INFLOW PROJECT
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1970-1979
>
1979
>
1956 RES CITY COUNCIL IN RES NO 1675 PASSED ON 24TH DAY OF MARCH 1975 ADOPTED PROJECT SCHEDULE FOR INFILTRATION/INFLOW PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2017 2:56:11 PM
Creation date
7/31/2012 3:07:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - Date
7/30/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proiect Schedule <br />Item <br />STEP 1 , <br />A. Infiltration/Inflow Analysis <br />(with Evaluation Survey Plan of Study if <br />required) completed & subnu_tted to State <br />after Step 1 grant award. <br />Cal.endar Days <br />NA-- days <br />P. Infiltration/Inflow Evaluation Survey (if <br />required) completed & submitted to State Complete aays <br />after grant amendment for Survey. <br />C. Application for taaste Control <br />Permit (if required) made no later than 120 days <br />after Public Hearing notice for Facility_ <br />Plan is issued. <br />D. Final Environmental Assessment and <br />Facility Plan (including time for draft <br />reports, advertisement & hearing) <br />completed and submitted to the State 395 days <br />after Step 1 grant amendment award. <br />STEP 2 ' <br />A. User Charge System and Industrial <br />Cost Recovery System (if required) <br />developed and submitted to the State 365 days <br />after Step 2 grant award. <br />B. Preliminary Plan of Operation (if required) <br />completed and submitted to the State 365 days <br />after Step 2 grant award. <br />C. Final Plans and Specifications, <br />completed and submitted to State 5~8 days <br />after Step 2 grant award. <br />STEP 3 <br />A. Advertise for Construction Bids within 30 days <br />after authorization to advertise for <br />bids has been issued. <br />B. Submit Bid Opening Documents within 105 days <br />after authorization to advertise for <br />bids has been i.ssued. <br />C. Award of Construction Contract within 3(,) days <br />after authorization to award the contract <br />has been issued. <br />D. Initiation of- Construction within 60 days <br />after the award of the contract. <br />F. Complete Constructior_ within 730 days <br />after inztiation of construction. <br />EXHIBIT A <br />