Laserfiche WebLink
AraLraDrlrNT No. 2 <br />AMENDED PLAN OF 5TUDY <br />C-48-124b <br />CITY OF PARIS, TEXAS <br />Facility Plannin <br />Concluct planning studies to GE'.tErA1111E the most socio-economical <br />me ans of provid ing wastewater tre atment service s and sewer <br />collection/eransportation including remaining infiltration/ <br />inflows after rehabilitation of the existing sewer lines, <br />services to the urban area in the approved desi~nated planning <br />area af the City of Paris and ho].d a local public hearing on <br />said planning area in accordance with 40 CFR Part 35, Subpart E. <br />The studies w111 include the following alternatives in which <br />rehabilitation will be re-evaluated to coincide with alternatives: <br />(I) Convey a11 wastewater to the existing north side <br />treatment plant. <br />(2) Gonvey the Red River Drainage }3asin to the existing <br />north side plant and the Sulphur River Drainage <br />Basin to a new south side treatment plant. <br />Enviranmental Assessment <br />Prepare a draft Environmental Iripact Assessment, based on <br />existing data and documents in accordance with CG 99 (Rev. <br />9-7-78). Ho1d a local public hearing and provide a transcript <br />of same. Modify the draft EIA in accordance with the public <br />hearing information and submit to the regulatory agencies the <br />final EIA. No baseline environniental inventory or Environmental <br />Impact Statement is proposed. <br />Existi_ng Waste Control Order <br />Lngineer shall prepare and submi.t, the Owner's application fo.r <br />an amenciment to its existing State Waste Cantrol Order and Federal <br />NPDES. He sha11 attend, on the Ocaner's behalF, a regional public, <br />unopposed, hearing on the Waste Control Order.. He is not 1.Zable <br />for the 14aste Control Order approval. lhis tasic is not grant-in- <br />aicl elibibie. Cost estimate $2,357.00. <br />ivew Waste Control Order <br />Enbineer shall prepare and submit the Owner's appli.caLion for_ a <br />nei•i S tate 6dl-,s te Control Orde-r (s ) and Federal NPllES ( s). He sr a11 <br />attenct, on the Owner's behalf, a regional public hearing, unopposed, <br />an tlie Waste Control Order(s) . He is not liable for their <br />approval. This taslc is not grant-iLi-aid eligiUle. Cost estimate <br />$3,357.00. <br />Page 1 of 3 <br />EXHIBIT A <br />