Laserfiche WebLink
SPECIAL C024DITIODTS <br />SC. 1 General <br />The provisions of this secti.on of the Specificatians shall <br />govern in the event of any conflict between them and the <br />"General Conditions of Ayreement: <br />SC. 2 Engineer <br />The word "Engineer" in these Specifications shail be under- <br />stood as referrina to the City Engineer of the City of Paris, <br />ENGINEER of the owner, or such other ENGINEER or inspector as <br />may be authorized by said 0WNER to act in any particular <br />position. <br />SC. 3 Location of Project <br />This project is located at the Paris Public Library,326 South <br />Aiain Street, Paris, Texas. <br />SC. 4 Scope of Work <br />The work to be performed under this Contract consists of <br />furnishing all materials, labor, supervision, tools and equipment <br />necessary to perform the specified repair work, at the Paris <br />Public Library Building, consisting of cleaning and sealing <br />exterior masonry and stone walls, cleaning, caulking, and <br />sealing all exterior joints and structural cracks, lime stabilizing <br />soil around tize outside perir.meter of building, complete with <br />appurtenances, as shown an sketches, pZan, and specified herein. <br />SC. 5 Time Allotted For Completion <br />The time allotted for the completion of alI items of work <br />shall be sixty (60) consecutive calendar days, which time shall <br />begin on the tenth (lOth) day after the issuance of the work order. <br />The work order sha11 consist of a written request by the <br />Engineer for the Contractor to proceed with the repair work on <br />the project. <br />SC. 6 Forrts, Plan, and Specifications <br />Forms of Proposal, Contract and Bonds, Plan and Specifications <br />r.iay be obtained at the Office of the Director of Public Works, 1.20 <br />East Kaufr_an Street, Paris, Texas, upon deposit of Ten Dollars <br />($10.00), which sum so deposited will be refunded, provided the <br />prospective bidder complies with one of the following requirements: <br />(a) If no Proposal is submitted: All documents must be <br />returned. <br />(b) If Proposal is submitted: Al1 docunents, except <br />Proposal F'orm submitted as Bid must be returned to <br />the Office of the City Manager within fifteen (15) <br />calendar days from and after the time and date of re- <br />ceiving Proposals. <br />SC-1 <br />