My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1801 RES CITY COUNCIL AT ITS REGULAR MEETING ON 14TH DAY OF MARCH 1977 APPROVED ADVERTISEMENT FOR BIDS
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1970-1979
>
1977
>
1801 RES CITY COUNCIL AT ITS REGULAR MEETING ON 14TH DAY OF MARCH 1977 APPROVED ADVERTISEMENT FOR BIDS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2017 2:08:46 PM
Creation date
8/3/2012 10:52:47 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - Date
4/11/1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLEANIDiG ArID CAULY.ING EXTERIOR OPENINGS <br />A. SCOPE: <br />Furnish and install all labor, equipment, and materials <br />necessary to provide a complete watertight installation of <br />all windows, doors, and other exterior openings. <br />B. QUALIFICATION OF WORICMEI3: <br />Only skilled and experienced mechanics, engaged full time <br />in cleaning and caulking exterior type work shall be permitted <br />to do this work. <br />C. COLOR SELECTION: <br />The Contractor shall submit standard color chart of the <br />caulking material to be used to the Engineer for his sel.ection <br />and approval. <br />D. PRODUCT HANDLING: <br />Caulking material shall be delivered to the site in sealed <br />containers with the manufacturer's name and trademark clearly <br />indicated thereon. Each shipment of caulking material shall be <br />accompanied by a statement of the ma.nufacturer certifying that <br />it complies with Federal ar American Standard Specifications. <br />E. D'1ATERIALS : <br />Al1 r,iaterials shall be appZied according to manufacturez's ' <br />printed directions. Al1 materials used in association with <br />caulking shall meet the requirements of manufacturer's printed <br />literature. <br />1. Caulking shall be "Pecora SynthacaZk G.C.-9", or equal <br />quality material approved by the Engineer. <br />F. PREPARATION OF JOINT SURFACE: <br />Remove existing old caulking from the joint around windows, <br />doors, and other exterior openings to be caulked, and thoraughly <br />clean the joint of all dust or other laose or foreign material, <br />preferable with compressed air, for a depth of not less than <br />1/2 inch. <br />TS-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.