My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1841 RES CITY COUNCIL IS DESIROUS OF ACCOMPLISHMENT OF IMPROVEMENT TO BLAKE ROAD
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1970-1979
>
1977
>
1841 RES CITY COUNCIL IS DESIROUS OF ACCOMPLISHMENT OF IMPROVEMENT TO BLAKE ROAD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2017 2:19:28 PM
Creation date
8/3/2012 2:55:51 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - Date
12/12/1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(f) Consulting and advising with the City and preparing routine <br />change orders as required; <br />(g) Reviewing shop and working drawings furnished by con- <br />tractors for compliance with design concept and with infor- <br />mation given in contract documents (Contractor is responsi- <br />ble for dimensions to be confirmed and correlated at job <br />site); <br />(h) Interpreting intent of plans and specifications to City, <br />Contractor and resident Project Representative; <br />(i) Preparation of monthly and final estimates for payments to <br />contractors, and furnishing any necessary certifications as <br />to payments to contractors and suppliers; <br />(j) Performing, in company with the representative of the <br />City, a final inspection of the project; <br />(k) Revision of construction drawings, with the assistance of <br />the resident Project Representative, to reflect any revi- <br />sions included in construction records. <br />III. <br />For the basic services outlined in Section II, above, the total <br />compensation to the Engineer shall be the lump sum amount of <br />$13, 488. 00. Upon completion of the preparation of detailed plans and <br />specifications, the Engineer shall be paid an amount equal to <br />eighty-five percent (8570) of the stipulated lump sum amount. During <br />- 4 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.