Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
the progress of construction, the Engineer shall be paid the remain- <br />ing fifteen percent (15°/~0) of the stipulated lump sum amount. This <br />payment shall be made in proportion to the contractor's earnings and <br />shall be adjusted as necessary during the life of the contract so that <br />the total amount paid to the Engineer shall be equal to the percentage <br />stipulated. <br />IV. <br />The charge provided herein shall not include property, boundary <br />and right--of-way surveys, shop, mill, field or laboratory inspection of <br />materials; cost of test bor.ings and other subsurface explorations; <br />copies of plans and specifications in excess of five (5); calculations of <br />special assessments or preparation of right-of-way plats and descrip- <br />tions; the services of a resident Project Representative for continuous <br />on-the-site observance of the work; or the furnishing of construction <br />line and grade surveys. <br />If the City elects to have the Engineer furnish services of a <br />resident Project Representative for continuous on-the--site observance <br />of the work or the furnishing of construction line and grade surveys, <br />the Engineer will furnish this service at the actual sa.lary cost of <br />personnel thus engaged times a multiplier of 2. 10; direct expenses <br />and subcontract costs incurred shall be reimbursed at actual cost <br />times a multiplier of l. 10. <br />- 5 - <br />