Laserfiche WebLink
• Due to the retirement this year of significant utilities-related debt, we have been able to <br />include a significant amount of new and replacement equipment in the budgets for both the <br />water plant ($160,000), and the sewer plant ($123,500), at Lake Pat Mayse ($55,000), and <br />also at various sewer lift stations ($66,000). <br />• I have added $80,000 for street repairs and $40,000 for drainage work. <br />• I have added $1.2 million for replacement of some of our worst water and wastewater lines <br />in hopes of reducing outages, breaks, impacts on sewer plant volumes, street damage, and <br />repair costs, and placed $55,800 in the budget to purchase equipinent to help us do some of <br />this work in-house. We actually began planning these projects on July 24 so we can move <br />quickly once the appropriation is approved; for the most part we will use in-house <br />engineering. We may not be able to fund a line replacement program at this level in future <br />years, but we absolutely need to make a commitment to some sort of long-term <br />replacement program. An additional $3.405 million was approved in May to replace 15 old <br />water lines as part of a Texas Water Development Board loan, though as part of a state <br />prograln, actual construction is not expected to begin for mare than a year and will not be <br />complete until 2014. <br />• We have budgeted $400,000 for a new SCADA system. This vital communication system <br />cost might be able to be deferred, but the need will not go away, so the sooner we can <br />address it the better. <br />• I have included $13,165 for merit raises far certain exceptional employees. <br />• Not in this budget year, but relatively soon, we will need to begin tangible plans for design <br />and ultimate construction of a large new wastewater plant. This work too can be deferred, <br />but operating and maintenance costs in the meantime are considerably higher, while <br />dependability is lower. <br />UTILITIES FUND <br />2010-11 <br />2011-12 <br />2012-13 <br />Increase <br />Percent <br />Warehouse <br />116,472 <br />109,280 <br />114,596 <br />5,316 <br />4.86 <br />Billing & Collecting <br />453,661 <br />579,906 <br />591,092 <br />11,186 <br />1.93 <br />Inter-fund Transfers <br />1,140,000 <br />1,140,000 <br />1,567,000 <br />427,000 <br />37.46 <br />Water Production <br />2,489,475 <br />2,865,221 <br />3,030,817 <br />165,596 <br />5.78 <br />Water Distribution <br />1,331,258 <br />1,496,673 <br />1,573,167 <br />76,494 <br />5.11 <br />Sewer Maintenance <br />589,927 <br />866,436 <br />989,652 <br />123,216 <br />14.22 <br />Sewer Treatment <br />2,032,410 <br />2,097,928 <br />2,195,229 <br />97,301 <br />4.64 <br />Lift Stations <br />307,905 <br />407,250 <br />442,067 <br />34,817 <br />8.55 <br />Line Replacements <br />- <br />- <br />1,200,000 <br />1,200,000 <br />100.00 <br />Contingency <br />- <br />- <br />13,165 <br />13,165 <br />100.00 <br />Utilities Debt <br />- <br />3,823,250 <br />1,694,895 <br />(2,128,355) <br />(55.67) <br />TOTAL <br />8,461,108 <br />13,385,944 <br />13,411,680 <br />25,736 <br />0.19 <br />