My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 A to F-Depot Project Manual
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
09 - September
>
September 10, 2001
>
06 A to F-Depot Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:54 AM
Creation date
8/2/2001 8:16:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-A through 6-F
AGENDA - Type
PROJECT MANUAL
Description
Paris Santa Fe-Frisco Railroad Depot Rehabilitatio
AGENDA - Date
9/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paris Santa Fe~Frisco Depot Rehabilitation © KEYSTONE ARCHITECTS <br /> July 10, 2001 <br /> <br />DIVISION 00 - BIDDING REQUIREMENTS, CONTRACT FORMS, AND <br /> CONDITIONS OF THE CONTRACT <br /> <br />DOCUMENT 00100: INSTRUCTIONS TO BIDDERS <br />PART 1 - GENERAL <br /> <br />1.01 INSTRUCTIONS TO BIDDERS: The American Institute of Architects Document A701 <br />Instructions To Bidders, latest edition, forms a part of the Bidding Documents and by reference <br />is incorporated herein as if repeated at length. <br /> <br />1.02 RELATED DOCUMENTS: <br /> <br /> A. Document 00120 - TxDOT Special Provisions <br /> B. Document 00200 - Part A, Bid Form <br /> C. Document 00200 - Part B, Contract Breakdown Forms <br /> <br />1.03 METHOD OF PROJECT DF. lIVERY: This project shall be executed using the <br />Construction Management form of project delivery whereby the work shall be accomplished by <br />multiple prime and sub-contractors coordinated by a Construction Manager as designated by <br />the City of Paris. As such the Construction Manager shall be deemed the agent for the City of <br />Paris with respect to this work. The Construction Manager's coordination and facilitation of <br />work by the prLme and sub-contractors, hereinafter referred to as contractors, sub-contractors or <br />applicators, does not in any way remove or reduce the responsibility of such contractors for <br />executing all work within their designated scope of work in a good and workmanlike manner, in <br />compliance with the requirements and specifications contained within this Project Manual, and <br />for final and complete responsibility for job site safety, code compliance, labor laws and <br />applicable federal, state and local laws pertaining to this type of work. <br /> <br />1.04 BID SUBMITTAL: Contractor's sealed bid to be delivered to: <br /> Mr. Thomas Haynes <br /> Project Director <br /> City of Paris, Texas <br /> 135 1'~ Street SE <br /> PO Box 9037 <br /> Paris, Texas 75461-9037 <br /> <br />Initial bid opening will take place on August 28, 2001 , at 3:00 pm in The City of <br />Paris Council Chambers, City Hall, Paris, Texas. <br /> <br />1.05 BID FORMAT AND SCOPE: <br /> <br />Bids shall be submitted on the forms provided in Document 00200B Contract Breakdown <br />Forms. Bid price shall include all direct and indirect costs associated with the construction <br />of all elements defined or implied within the bidding documents, and all permits required for <br />completion of the project. Each element shall be categorized according to these Bid <br />Breakdown Forms contained within Section 00200 Pan B. Bid elements shall be categorized <br /> <br /> Document 00100 <br /> Page 1-3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.