My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 A to F-Depot Project Manual
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
09 - September
>
September 10, 2001
>
06 A to F-Depot Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:54 AM
Creation date
8/2/2001 8:16:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-A through 6-F
AGENDA - Type
PROJECT MANUAL
Description
Paris Santa Fe-Frisco Railroad Depot Rehabilitatio
AGENDA - Date
9/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paris Santa Fe-Frisco Depot Rehabilitation © KEYSTONE ARCHITECTS <br /> July 10, 2001 <br /> <br />1.10 CONTRACT AWARD: <br /> <br />Contracts will be awarded to the lowest bona:fide bidders with verifiable comparable work <br />experience and demonslxated abilities to perform the work as described in the bidders' <br />Description of Methodology. <br /> <br />1.11 PROJECT LENGTH <br /> <br />The project is estimated to require 300 working days. A work day is defined as a non-federal <br />or state holiday, Monday through Friday with an 8 hour work period. <br /> <br />1.12 NON-RESPONSIVE BID <br /> <br />A bid or proposal is considered non-responsive and may be rejected if: <br /> <br /> 1. It is late, <br /> 2. It is illegible, <br /> 3. Bid Form and Contract Breakdown Forms are in a form other than the <br /> official forms provided herein, <br /> 4. There is reason to believe that collusion exists among the Bidders, <br /> 5. It is missing any item or portion of any item described above in Document <br /> 00100 items 1.01 through 1.12 or items required in Document 00120 <br /> TxDOT Special Provisions. <br /> <br />1.13 The Bidder shall deliver all required bonds to the Owner at the time the Contract is <br />executed. <br /> <br />PART 2 - NOT USED <br /> <br />PART 3 - NOT USED <br /> <br /> ** END OF SECTION ** <br /> <br /> Document 00100 <br /> Pa~e 3-3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.