My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 A to F-Depot Project Manual
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
09 - September
>
September 10, 2001
>
06 A to F-Depot Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:54 AM
Creation date
8/2/2001 8:16:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-A through 6-F
AGENDA - Type
PROJECT MANUAL
Description
Paris Santa Fe-Frisco Railroad Depot Rehabilitatio
AGENDA - Date
9/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paris Santa Fe-Frisco Depot Rehabilitation O KfYSTONE ARCHIT[CTS <br /> July 10, 2001 <br /> <br />SECTION 04920 MARBLE FABRICATION & INSTALLATION <br /> <br />SECTION 04920: MARBLE FABRICATION & INSTALLATION <br /> <br />PART 1 - GENERAL <br /> <br />1.01 DESCRIPTION OF WORK: <br /> <br /> A. Work Included: Fabrication and installation of replicated historic marble; rehabilitation and <br /> reuse of original historic marble for wainscoting, marble counteltops and marble toilet stall <br /> partitions as shown on Drawings. <br /> <br /> 1. Fabrication and installation of replicated historic marble shall match original historic <br /> marble in all aspects of composition and fabrication <br /> <br /> 2. Rehabilitation work shall include repair and re-use of salvaged original historic <br /> marble toilet stalls. All repair and replacement work shall match original marble in <br /> all aspects of composition, fabrication and appearance. <br /> <br />1.02 GENERAL REQUIREMENTS: <br /> <br /> A. Requirements of General and supplementary conditions and Division 01 apply to all work <br /> in this section. <br /> <br /> B. Requirements of Section 02050 DEMOLITION apply to all work in this section. <br /> <br /> C. Applicator shall have a minimum of 5 years verifiable experience in the fabrication of <br /> marble countertops, stalls and/or paneling. <br /> <br />1.03 SUBMITFALS: <br /> <br /> 1. Samples: Provide samples of marble proposed for replica fabrication for Architects <br /> review. Resubmit samples as requested by Architect until acceptable application, <br /> color, and texture is achieved. <br /> <br /> 2. Shop Drawings: Submit shop drawings of fabrication and installation details to <br /> Architect for review and approval. <br /> <br />1.04 JOB CONDITIONS: <br /> <br /> A. Do not commence marble acquisition, fabrication or installation until receipt of written <br /> approval of Samples and Submittals by Consu'uction Manager. <br /> <br /> C. Do not install marble components during adverse jobsite conditions. Coordinate <br /> sequencing of work with Construction Manager. <br /> <br /> Section 04920 <br /> Page 1-3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.