My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 A to F-Depot Project Manual
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
09 - September
>
September 10, 2001
>
06 A to F-Depot Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:54 AM
Creation date
8/2/2001 8:16:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-A through 6-F
AGENDA - Type
PROJECT MANUAL
Description
Paris Santa Fe-Frisco Railroad Depot Rehabilitatio
AGENDA - Date
9/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paris Santa Fe-Frisco Depot Rehabilitation © K[YST©N[ ARCHIT[CT$ <br /> July 10, 2001 <br /> <br /> a. rotary drill attachraents <br /> b. waterblasting <br /> c. sandblasting <br /> d. blow torches, heat plates or heat blowers <br /> <br /> C. Rejuvenate all weathered wood prior to repainting with wood rejuvenation solution <br /> specified above. Surfaces must be completely dry prior to repainting. <br /> <br /> D. Pre-Priming: Scrape and clean small, dry, seasoned knots and apply a thin <br /> coat of white shellac or other recommended knot sealer, before application of <br /> priming coat. After priming, fill holes and imperfections in finish surfaces <br /> with putty or compatible wood-filler. Sandpaper smooth when dried. <br /> <br /> E. Priming: <br /> <br /> 1. Prime, stain, or seal wood required to be job-painted immediately upon <br /> delive~ to job. Prime edges, ends, faces, undersides, and backsides <br /> of such wood, including cabinets. <br /> <br /> 2. When stain finish is required, use same paint material for back- <br /> priming. <br /> <br /> 3. Seal tops, bottoms, and cut-outs of un-primed wood doors with a heavy <br /> coat of sealer immediately upon delivery to job. <br /> <br /> F. Staining: <br /> <br /> 1. All surfaces scheduled to receive stain shall be surface sanded to a satin <br /> smooth finish. All gouges, scratches or other surface imperfections shall be <br /> filled with compatible linseed oil wood filler and sanded satin smooth. <br /> <br /> 2. Remove all dust and grit prior to beginning stai ning and varnishing. <br /> <br /> 3. All surfaces shall be sanded smooth with 30© grit sandpaper between each <br /> coat of stain and/or varnish. <br /> <br /> O. Ferrous Metals: Clean ferrous surfaces, which are not galv~mized or shop-coated, <br /> of oil, grease, dirt, loose mill scale and other foreign substances by solvent or <br /> mechanical cleaning. <br /> <br /> I. Touch-up shop-applied prime coats wherever damaged or bare, where <br /> required by other sections of this PROJ~CTMANUAL Clean and <br /> touch-up with same type shop primer. <br /> <br /> H. Galvanized Surfaces: Clean free of oil and surface contaminants with non- <br /> petxoleum based solvent. <br /> <br /> Section 09900 <br /> Page 6- l I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.