My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 A to F-Depot Project Manual
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
09 - September
>
September 10, 2001
>
06 A to F-Depot Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:54 AM
Creation date
8/2/2001 8:16:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-A through 6-F
AGENDA - Type
PROJECT MANUAL
Description
Paris Santa Fe-Frisco Railroad Depot Rehabilitatio
AGENDA - Date
9/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paris Santa Fe-Frisco Depot Rehabilitation O KEYSTONE ARCHITECTS <br /> July 10, 2001 <br /> <br />SECTION 09910 PLASTER <br /> <br />SECTION 09910: PLASTER <br /> <br />PART 1 - GENERAL <br /> <br />1.01 DESCRIPTION OF WORK: <br /> <br /> A. Work Included: Restoration of existing interior plaster. <br /> <br /> 1. Restoration work shall include in-kind replacement of damaged and <br /> inadequately attached plaster and substrate, as well as repair (patching <br /> and matching) of firmly attached existing plaster. <br /> <br /> 2. The work includes removal of existing irreparable plaster and <br /> substrate. <br /> <br /> 3. All new interior plaster used for repair and replacement shall match <br /> existing plaster in all aspects of composition, application and <br /> appearance, unless otherwise directed by Architect. <br /> <br /> 4. The work does not include the removal of materials containing lead <br /> based paint or asbestos. Lead based paint and asbestos containing <br /> materials removal will be executed by an independent hazardous materials <br /> abatement contractor. All Contractors, their employees and agents shall <br /> make themselves familiar with which materials in the building have been <br /> identified as hazardous materials and take appropriate precautions to avoid <br /> exposure to these materials. If in the course of work, materials are <br /> uncovered which are suspected of containing hazardous materials, <br /> Contractor shall report same in writing immediately to Owner. <br /> <br /> 5. Coating the new gypsum board walls with plaster texture to match <br /> existing. <br /> <br />1.02 SUBMITTALS: <br /> <br /> Section 09910 <br /> <br /> Page 1-7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.