My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 A to F-Depot Project Manual
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
09 - September
>
September 10, 2001
>
06 A to F-Depot Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:54 AM
Creation date
8/2/2001 8:16:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-A through 6-F
AGENDA - Type
PROJECT MANUAL
Description
Paris Santa Fe-Frisco Railroad Depot Rehabilitatio
AGENDA - Date
9/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paris Santa Pc-Frisco Depot Rehabilitation © KEYSTONE ARCHITECTS <br /> July 10, 2001 <br /> <br /> H. Coordination of work of multiple prime contractors or sub-contractors under direct <br /> contract to Owner. This work shall be carried out by the Construction Manager, <br /> <br /> I. This work does not include the removal of lead based paint, asbestos or other hazardous <br /> materials. Hazardous materials abatement will be executed by an independent hazardous <br /> materials abatement contractor. Contact the Owner for further details. All Contractors, <br /> their employees and agents shall make themselves familiar with which materials in the <br /> building have been identified as hazardous materials and take appropriate precautions to <br /> avoid exposure to these materials. If in the course of work, materials are uncovered which <br /> are suspected of containing hazardous materials, Contractor shall report same <br /> immediately to Owner. Contact Owner for further details, <br /> <br /> J. Exterior Wood Restoration & Painting at all donners, <br /> <br /> K. Termite Control, <br /> <br /> L. Exterior Soffit, bead board replacement, <br /> <br /> M. Electrical Fixtures procurement by Owner, including exterior pole lamps (installation <br /> shall remain the responsibility of the Contract 5 sub-contractor), <br /> <br /> N. Site preparation and earthwork, <br /> <br /> O. Finish Grading <br /> <br /> P. Ceiling Fan Fixture Procurement by Owner (installation shall remain the responsibility of <br /> the Contract 5 sub-contractor), <br /> <br />1.05 OTHER ITEMS EXCLUDED FROM CONTRACT: The following items will be <br />provided, complete, by the Owner or others, and not as part of this Contract: <br /> <br /> A. Office Trailer <br /> B. Telephone <br /> C. Fax <br /> <br /> D. Pot-A-Johns <br /> E. Water Source <br /> F. Electrical Source <br /> <br /> Section 01000 <br /> Page 4-5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.