My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 A to F-Depot Project Manual
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
09 - September
>
September 10, 2001
>
06 A to F-Depot Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:54 AM
Creation date
8/2/2001 8:16:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-A through 6-F
AGENDA - Type
PROJECT MANUAL
Description
Paris Santa Fe-Frisco Railroad Depot Rehabilitatio
AGENDA - Date
9/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pads Santa Fe-Ffisco Depot Rehabilitation © K[YSTON[ ARCHITECTS <br /> July 10, 2001 <br /> <br /> employees, suppliers or others acting under his direction or associated with his work or <br /> affected by his work. <br /> <br /> H. All utilities are to be provided to the building underground as per local codes. <br /> Contractor to be responsible for coordination with the respective utility companies <br /> and the City of Pads. Contractor shall obtain and pay for all permits required. <br /> <br /> I. The Architect or Construction Manager maintains the right to stop work of any <br /> Contractor or Sub-Contractor who fails to perform his work properly in <br /> conformance with the Project Drawings and Specifications, and/or in a good and <br /> workmanlike manner, at any time. Any and all additional costs associated with work <br /> stoppage shall be the sole responsibility of the Contractor. <br /> <br /> J. The Contractor and all Sub-Contractors shall take all precautions to protect the <br /> property from damage by weather. Work shall be completed as soon as possible to <br /> make the building watertight. Check weather reports before exposing work and <br /> then pursue work with all haste. Provide and install waterproof covers to protect <br /> the property from damage as required. <br /> <br />1.04 WORK EXCLUDED FROM CONTRACT: <br />The following items of work will be provided, complete, by the Owner or others, and not as <br />part of this Contract: <br /> <br /> A. Any work or items noted "N.I.C." (Not in Contract) on the Drawings, Specifications and <br /> Addenda, <br /> <br /> B. Roof Tile Restoration, <br /> <br /> C. RoofTruss Reinfomement, <br /> <br /> D. Attic Catwalk Installation, <br /> <br /> E. Gutters and Downspouts to within 4"-0" +/- of exterior building concrete, <br /> <br /> F. Site Clean-up, <br /> <br /> G. Parking Lot Clean-up and Re-striping, <br /> <br /> Section 01000 <br /> Page 3-5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.