My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 A to F-Depot Project Manual
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
09 - September
>
September 10, 2001
>
06 A to F-Depot Project Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:22:54 AM
Creation date
8/2/2001 8:16:15 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-A through 6-F
AGENDA - Type
PROJECT MANUAL
Description
Paris Santa Fe-Frisco Railroad Depot Rehabilitatio
AGENDA - Date
9/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paris Santa Fe-Frisco Depot Rehabilitation ~ KEYSTONE ARCHITECTS <br /> July 10, 2001 <br /> <br /> C. Amount of each allowance: <br /> <br /> No Allowance Amounts Included at This Time. <br /> <br />1.04 SELECTION OF PRODUCTS UNDER ALLOWANCES <br /> <br /> A. Architect's Duties: <br /> <br /> 1. Make selection in consultation with the Owner. Provide final decision designating: <br /> a. Product, model and finish. <br /> b. Accessories and attachments. <br /> <br /> c. Supplier and installer if applicable. <br /> d. Cost to Contractor, delivered to the site or installed, as applicable. <br /> e. Manufacturer's Warranties. <br /> <br /> 3. Prepare Revision Drawings and/or Specification modifications, if required. <br /> <br /> 4. Transmit Owner's decision to the Construction Manager. <br /> <br /> B. Contractor's Duties: <br /> <br /> 1. Assist Architect and Owner in determining qualified suppliers or installers. <br /> <br /> 2. Obtain proposals from suppliers and installers and convey to Construction Manager. <br /> <br /> 3. Make appropriate recommendations for consideration when requested by the Architect <br /> or Construction Manager. <br /> <br /> 4. Notify Construction Manager promptly of: <br /> <br /> a. Any reasonable objections Contxactor may have against any supplier, or party <br /> under consideration for installation. <br /> <br /> b. Any effect on the Construction Schedule anticipated by selections under <br /> consideration. <br /> <br /> 5. Submit proposal including pricing information as required for changes in the Work. <br /> <br /> a. Include in the proposal amount any changes properiy documented, in handling <br /> costs at the site, labor, installation costs, overhead, profits and other expenses <br /> caused by the selection under the allowance. <br /> <br /> Section 01200 <br /> Page 2-3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.