Shop Drawings--All drawings, diagrams, illustrations, <br />schedules and other data which arc specificallY prepared by <br />or for CONTRACTOR to illustrate some portion of the Work <br />and all illustrations, brochures, standard schedules, perfor- <br />mance charts, instructions, diagrams and other information <br />prepared by a Supplier and submitted by CONTRACTOR to <br />illustrate material or equipment for some portion of the Work. <br /> Specifications--Those portions of the Contract Documents <br /> consisting of written technical descriptions of materials, <br /> equipment, construction systems, standards and workman- <br /> ship as applied to the Work and certain administrative details <br /> applicable thereto. <br /> <br /> Subcontractor--An individual, firm or corporation having a <br /> direct contract with CONTRACTOR or with any other Sub- <br /> contractor for the performance of a part of the Work at thc <br /> site. <br /> SubstantlalCompletion--The Work (or a specified part thereo0 <br /> has progressed to the point where, in the opinion of ENGI- <br /> NEER as evidenced by ENGINEER's definitive certificate <br /> of Substantial Completion, it is sufficiently complete, in <br /> accordance with the Contract Documents, so that the Work <br /> (or ~pecified part} can be utilized for the purposes for which <br /> it is intended; or if there be no such certificate issued, when <br /> final payment is due in accordance with paragraph 14.13. The <br /> terms "substantially complete" and "substantially com- <br /> pleted'' as applied to any Work refer to Substantial Comple- <br /> tion thereof. <br /> <br /> Supplementao' Conditions~The part of the Contract Docu- <br /> ments which araends or supplements these General Condi- <br /> tions. <br /> Sttpplier~A manufacturer, fabricator, supplier, distributor, <br /> materialman or vendor. <br /> <br /> UndergroundFocilitles--AIl pipelines, condults,ducts.'cablas, <br /> wires, manholes, vaults,tanks, tunnels or other such facilities <br /> or attachments, and any encasements containing such facil- <br /> ities which have been installed underground to furnish any of <br /> the following services or materials: electricity, ga~es, ate.am, <br /> liquid petrnieum products, telephone or other commuTes- <br /> tigriS, cable television, sewage and drainage removal, traffic <br /> or other control systems or water. <br /> Unit Pdce Work--Work to be paid for on the basis of unit <br /> prices. <br /> Work--The entire completed construction ortho various sep- <br /> arately identifiable parts thereof required to be furnished <br /> under the Contract Documents. Work is the result of per- <br /> forming services, furaishlng labor and furnishing and incor- <br /> porating materials and equipment into the construction, rill <br /> aa required by the Contract Documents. <br /> Work Directive Change~A written directive to CONTRAC- <br /> TOR, issued on or after the Effective Date of thc Agreement <br /> and signed by OWNER and recommended by ENGINEER, <br /> <br /> ordering an addition, deletion or rcvisiofi in the Work, or <br /> responding to diffedng or unforeseen physical conditions under <br /> which the Work is to be performed as provided~n_ pa,-agraph <br /> 4.2 or 4.3 or to emergencies under paragraph 6.22. A Work <br /> Directive Change may not change the Contract Price or the <br /> Contract Time, but is evidence that the parties expect that <br />· the change directed or documented by a Work Directive <br /> Change will bo incorporated in a subsequently issued Change <br /> Order following negotiations by the parties as to its effect, if <br /> any, on the Contract Price or Contract Time as provided in <br /> paragraph 10.2. <br /> <br /> Written Amendntent--A written amendment of the Contract <br /> Documents, signed by OWNER and CONTRACTOR on or <br /> after the Effective Date of the Agreement and normally deal- <br /> ing with the nonenglneedng or nontechnical rather than strictly <br /> Work-relatod aspects'of the Contract Documents. <br /> <br />ARTICLE 2--PRELIMINARY MATTERS <br /> <br />Delivery of Bonds: <br /> 2.1. WhenCONTRACTOR delivers the executed Agree' <br />merits to OWNER, CONTRACTOR shall also deliver to <br />OWlqER such Bonds as CONTRACTOR may be required to <br />furnish in accordance with paragraph 5.1. <br /> <br />Copies of Documents: <br /> 2.2. OWNER shall furnish to CONTRAC~'OR up to ten <br />copies (unless otherwise specified in the Supplementary Con- <br />ditions) of the Contract Documents as are reasonably nec- · <br />essary for the execution of the Work. Additional copies will <br />bo furnished, upon request, at the cost of reproduction. <br /> <br />Commencement of Contract Time; Notice to Proceed: <br /> 2.3. The Contract Time will commence to run on the <br />thirtieth day after the Effective Date of the Agreement, or, if <br />a ~qotice to Proceed is given, on the day indicated in the <br />~otlce to proceed. A Notice to Proceed may be given at any <br />time within thirty days after the Effective Date of the Agree- <br />ment. In no event will the Contract Time commence to run <br />later than the seventy-fifth day after the day of Bid opening <br />or the thirtieth day after the Effective Date of tbe_A.greement, <br />whichever date is earlier. <br /> <br />Starting the Project: <br /> 2.4. cONTRACTOR shall start to perform the Work on <br />the date when the Contract Time commences to run, but no <br />Work shall be do'ne at tho site prior to the date on which the <br />Contract Time commenCeS to run. <br /> <br />Before Starting Construction: <br /> 2.5. Before undertaking each part of {ha Work, CON- <br />TRACTOR shall carefully study and compare the Contract <br />Documents and check and verify pertinent figures shown <br /> <br />*See Supplementary Conditions <br /> <br /> <br />