thereon and all applicable ficld meilsurcments. CONTRAC- <br />TOR shall promptly report in writing to ENGINEER any <br />conflict, error or discrepancy which CONTRACTOR may <br />discover and shall obtain a written interpretation or clarifi- <br />cation from ENGINEER before proceeding with any Work <br />affected thereby; however, CONTRACTOR shall not be lia- <br />ble to OWNER. or ENGINEER for failure to report any <br />conflict, error or discrepancy in the Contract Documents, <br />unless CONTRACTOR had actual knowledge thereof or should <br />reasonably have known thereof. <br /> <br /> 2.6. Within ten days after the Effective Date of the Agree- <br /> ment (unless othenvise specified in the General Require- <br /> ments), CONTRACTOR shall submit to ENGINEER for <br /> review: <br /> <br /> 2.6,1. an estimated progress schedule indicating the <br /> starting and completion dates of the various stages of the <br /> Work; <br /> <br /> 2.6.2. a preliminary schedule of Shop Drawing sub- <br /> missions; and <br /> <br /> 2.6.3. a preliminary schedule of values for ail of the <br /> Work which will include quantities and prices of items <br /> aggregating the Contract Price and will subdivide the Work <br /> into component parts in sufficient detail to serve as the <br /> basis for progress payments during construction. Such <br /> prices wilt include an appropriate amount of overhead and <br /> profit applicable to each item of Work which will be con- <br /> firmed in writing by CONTP,.ACTOR at the time of sub- <br /> mission. <br /> <br /> 2.7. Before any Work at the site is started, CONTRAC- <br /> TOR shall deliver to OWNER, with a copy to ENGINEER, <br /> certificates (and other evidence of insurance requested by <br /> OWNER) which CONTP..ACTORis required to purchase and <br /> maintain in accordance with paragraphs 5.3 and 5.4, and <br /> OWNER shall deliver to CONTRACTOR certificates (and <br /> other evidence of insurance requested by CONTRACTOR) <br /> which OWNER is required to purchnse and maintain in <br /> accordance with paragraphs 5.6 and 5.'/. <br /> <br />Preconstructlon Conference: <br /> 2.8. Within twenty days after the Effective Date of the <br />Agreement, but before CONTRACTOR starts the Work at <br />tho site, a conference attended by CONTRACTOR, ENGI- <br />NEER and others as appropriate will be held to discuss the <br />schedules referred to in paragraph 2.6, to discuss procedures <br />for handling Shop Drawings and other submittals and for <br />processing Applications for Payment, and to establish aworklng <br />under~tandlng among the parties as to the Work. <br /> <br />.© <br /> <br />Finalldng Schedules: <br /> 2.9. At least ten days before submlsslon of the first Appli' <br />cation for Payment a conference attended by CONTRAC- <br />TOR, ENGINEER and others as appropriate will be held to <br />finalize the schedules submitted in accordance with para- <br /> <br />*See Supplementary Conditions <br /> <br />graph 2.6. The finalized progress schedule will be acceptable <br />lo ENGINEER ns providing an orderly progression of the <br />Work to completion within the Contract Time. b~it such <br />acceptance will neither impose on ENGINEER responsibility <br />for the progress or scheduling of the Work nor relieve CON- <br />TRACTOR from full responsibility therefor. The finalized <br />schedule of Shop Drawing submissions will be acceptable to <br />ENGINEER as providing a workable arrangement for pro- <br />cessing the submissions. The finalized schedule of values will <br />be acceptable to ENGINEER as to form and substance. <br /> <br />ARTICLE 3--CONTRACT DOCUMENTS: INTENT, <br /> AMENDING, REUSE <br /> <br />Intent: <br /> <br /> 3.1. The Contract Documents comprise the entire .agrec' <br />ment between OWNER and CONTRACTOR concerning the <br />Work. The Contract Documents are complementary; what is <br />called for by one is as binding as if called for by all. The <br />Contract Documents will be construed in accordance with <br />the law of the place of the Project. <br /> <br />* 3.2. itistheintentoftheContractDocumentstodescribe <br />a functionally complete Project (or part thereo0 to be con- <br />st~ucted in accordance with the Contract Documents. Any <br />Work, materials or equipment that may reasonably be inferred <br />from the Contract Documents as being required to produce <br />the intended result will be supplied whetheror not specifically <br />called for. When words which have a well-known technical <br />or trade meaning are used to describe Work, materials or <br />equipment such words shall be interpreted in accordance with. <br />that meaning. Reference to standard specificatiods, manuals ' ' <br />or codes of any technical society, organization or assoclatlon, <br /> or to the Laws or Regulations of any governmental authority, <br /> whether such reference be specific or by implication, shall <br /> mean the latest standard specification, manual, code or Laws <br /> or Regulations in effect at the time of opening of Bids (or, on <br /> the Effective Date of the Agreement if there were no Bids), <br /> except as may be otherwise specifically stated. However, no <br /> provision of any referenced standard specification, manual <br /> or code (whether or not specifically incorporated by reference <br /> in the Contract Documents) shall be effective to change the <br /> duties and responsibilities of OWNER, CONTRACTOR or <br /> ENGINEER, or any of their consultants, agents or emPloy- <br /> ees from those set forth in the Contract Documer/ts, nor shall <br /> it be effective to assign to ENGINEER, or any of ENGI-' <br /> NEER's consultants, agents or employees, any duty or <br /> anthodty to supervise or direct the furnlshing or performance <br /> of the Work or any duty or authority to undertake responst- <br /> bllity contrb, ry to the provisions of paragraph 9.15 or 9.16. <br /> Clarifications and interpretations of the Contract Documents <br /> shall be issued by ENGINEER as provided in paragraph 9.4. <br /> 3.3. if, during the performance of the Work, CONTRAC' <br /> TON finds a conflict, error or discrepancy in the Contract <br /> Documents, CONTRACTOR shall so report to ENGINEER <br /> in writing at once and before proceeding with the Wodc affected <br /> thereby shall obtain a written interpretation or clarification <br /> <br />37 <br /> <br /> <br />