My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-C Hayter Engineering Agrmt
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
11 - November
>
November 12, 2001
>
07-C Hayter Engineering Agrmt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:21:00 AM
Creation date
10/17/2001 2:11:55 PM
Metadata
Fields
Template:
AGENDA
Item Number
7-C
AGENDA - Type
RESOLUTION
Description
Professional Services Agreement with Hayer
AGENDA - Date
11/12/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.3.5 <br /> <br />2.4 <br /> <br />24.1 <br /> <br />242 <br /> <br />2.43 <br /> <br />2.5 <br /> <br />2.51 <br /> <br />252 <br /> <br />2521 <br /> <br />252.2 <br /> <br />2523 <br /> <br />forms, invitations to bid and instructions to bidders, and assist in the preparation of' <br />other related documents. <br /> <br />Furnish one copy of the above documents and of the Drawings and Specifications and <br />present and review them with OWNER. <br /> <br />Bidding <br /> <br />Assist OWNER in advertising for bids for a single prime contract for the Work <br /> <br />Prepare addenda as appropriate to interpret, clarify or expand the Bidding Documents. <br /> <br />Attend the bid opening, prepare bid tabulation sheets, and recommend an award it' deemed <br />appropriate. <br /> <br />C~c~ngt n mticm Pha~e <br /> <br />ENGINEER shall consult, advise, and act as OWNER'S representative as provided in thc <br />construction contract. All of OWNER'S instructions to CONTRACTOR will be issued through <br />ENGINEER who will have authority to act on behalf of OWNER to the extent provided in said <br />construction contract. <br /> <br />In connection witb observations of the work of CONTRACTOR while it is in progress: <br /> <br />ENGINEER shall make visits to the site at intervals ENGINEER deems necessary, in order to <br />observe the progress and quality of the CONTRACTOR'S xvork. Based on information <br />obtained during such visits and on such observations, ENGINEER shall endeavor to determine <br />in general, if such work is proceeding in accordance with the contract documents <br /> <br />If' requested by OWNER or recommended by ENGINEER and agreed to in writing by <br />OWNER, an on-site observer will be furnished, to act as directed by ENGINEER in order to <br />assist ENGINEER in observing performance of the work. Such services will be paid ~br as per <br />Section 3b The duties and responsibilities and the limitations on the authority of the on-site <br />observer will be set forth in a separate exhibit which is to be made a part of this Agreement <br />before such services begin. <br /> <br />ENGINEER'S visits to, and representation by the on-site observer at the site, will enable <br />ENGINEER to better carry out the duties and responsibilities assigned to ENGINEER during <br />the Construction Phase, and, by exercise of ENGINEER'S effo~1s as an experienced and <br />qualified design professional, provide OWNER a greater degree of confidence that the <br />completed work of' CONTRACTOR will conform generally to the contract documents <br />ENGINEER shall not, however, during such visits or as a result of such observations, supervise, <br />direct or have control over CONTRACTOR'S work, nor shall ENG1NEER have authority over <br />or responsibility for the means, methods, techniques, sequences or procedures or construction <br /> <br />7 of 10 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.