Laserfiche WebLink
How will the bond money be spent <br />and whaf is the impact? <br />Prooosition No. 2. $2,7 million for water and sewer <br />syStem projects. <br />• 12-inch water main ori Mt. Zion Rd., from FM 663 <br />to Sudith Lane. <br />• 12-inch water main starting on US 287 from Morris <br />Road east and then sauth to Mt. Zion and on to <br />Sudith Lane. <br />• 12-inch water line on US 287, from US 67 to <br />Padera Lake. <br />• 10-inch sanitary sewar line, from the City of <br />Midlothian's Wastewater Treatment Plant to US <br />287. <br />• Sanitary Sewer lift station and force main <br />improvements througpiout the system. <br />The sale of the water and sewer bonds will require an <br />increase in utility bills of approximately $8.00 per <br />month. <br />Summary <br />The Bond program relieves traffic congestion and <br />provides the citizens of'Midlothian with an improved <br />roadway system and enhanced utility service <br />throughout the City. <br />