Laserfiche WebLink
6. Why is a library propositipn not included in this bond <br />proposal? , <br />Although library and arts was 4iven strong consideration by the <br />CIP Subcommittee, the City C¢uncil deternuned that there was <br />not enough information at this time to make a decision between <br />expansion of the existing library and construction of a new library. <br />In their detemvnation to spend',tax dollars wisely, the City Council <br />removed that proposition from Ithe ballot for further study. <br />The study will include future p$r capita space needs, pazking, serv- <br />ice level needs, and a citizen sutvey which will address these fac- <br />tors and determine if the one c~ntral library concept is still the de- <br />sire of the community. This st~dy is scheduled to be completed in <br />approximately six months. After the City Council has reviewed <br />this information, this important assue will to be brought back to the <br />citizens as a single proposition.' <br />7. How can I obtain more inf~rmation on the 1999 bond <br />election? <br />You may contact the City Man ger's Offce or the Community <br />Development Department at (9~2) 727-0100 or E-mail to <br />coar&i. allen. tx. us. ' <br />