Laserfiche WebLink
The removal of all <br />endanger or damage either new or exis <br />or sliding of the banks. All holes or i <br />immediately and completely filled and <br />with the approva] of the City, elects t <br />allowed for such materials left in plac <br />(d) <br />There shall be sufficien <br />remove any water that accumulates 'v <br />accumulate in the trench at any time v <br />shall not be allowed to accumulate uni <br />crosses natural drainage channels, the <br />or delays in the prosecution of the wi <br />disposal oFpumped surface water so <br />shall be responsible for maintaining sa <br />(e) Sub r~ ade <br />Excavation for the <br />subgrade and the bottom of the <br />in the plans. <br />(f) Soft SubQrade <br />Where sofr or spongy <br />removed to such a depth that by rep] <br />foundation can be secured. <br />Gravel used shall be <br />Where authorized by <br />replace unsuitable material will be <br />(S) <br />Excavated materials <br />Topsoil shall be <br />BACKFTLLING, of this <br />ting, shoring and bracing shall be done in such manAer as not to <br />ng structures, private or public properties; and so as to avoid cave-ins <br />ids left by the removal of the sheeting, shoring or bracings shall be <br />ompacted with suitable materials. If, for any reason, the Contractor, <br />leave in place the sheeting, shoring or bracing, no payment shall be <br />unless ordered by the City to be left in place. <br />pumping equipment, in good working order, available at all times to <br />excavations. The Contractor shall not allow any excess water to <br />tille the trench is open. Water from ground water or surface water <br />I afrer the trench has been completely backfilled. Where the pipeline <br />work shall be conducted in such a manner that unnecessary damage <br />rk will be prevented. Provisions shall be made for the satisfactory <br />s to prevent damage to public or private property. The Contractor <br />e working conditions and suitable construction techniques. <br />line shall be removed to a depth not less than four (4) inches below <br />brought to true subgrade with the embedment or encasement shown <br />ial is encountered in the excavation at subgrade level, it shall be <br />the unsuitable material with tamped gravel, a firm and suitable <br />or crushed stone as described in this section of the specifications. <br />; City, crushed stone used in excess of the specified embedment to <br />for at the unit bid price for gravel or crushed stone embedment. <br />be piled adjacent to the work to be used for backfilling as required. <br />separately in a careful manner for replacement as specified in <br />(h) Excavation in RoCk <br />When rock is encountored in the excavation process, it shall be undercut to a depth of at least <br />six (6) inches below the bazrel and aC least three (3) inches below the bells of the pipe. The laying surface <br />shall then be brought up to grade wuh the class of embedment or encasement shown in the plans. When <br />Item 2005-2 <br />