My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-J Cox Field Water Main
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2001
>
12 - December
>
2001-12-10
>
06-J Cox Field Water Main
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2012 11:03:47 AM
Creation date
12/4/2001 10:38:47 PM
Metadata
Fields
Template:
AGENDA
Item Number
6-J
AGENDA - Type
RESOLUTION
Description
Award bid for replacement of 8" water main at Cox Field Airport
AGENDA - Date
12/10/2001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The removal of all <br />endanger or damage either new or exis <br />or sliding of the banks. All holes or i <br />immediately and completely filled and <br />with the approva] of the City, elects t <br />allowed for such materials left in plac <br />(d) <br />There shall be sufficien <br />remove any water that accumulates 'v <br />accumulate in the trench at any time v <br />shall not be allowed to accumulate uni <br />crosses natural drainage channels, the <br />or delays in the prosecution of the wi <br />disposal oFpumped surface water so <br />shall be responsible for maintaining sa <br />(e) Sub r~ ade <br />Excavation for the <br />subgrade and the bottom of the <br />in the plans. <br />(f) Soft SubQrade <br />Where sofr or spongy <br />removed to such a depth that by rep] <br />foundation can be secured. <br />Gravel used shall be <br />Where authorized by <br />replace unsuitable material will be <br />(S) <br />Excavated materials <br />Topsoil shall be <br />BACKFTLLING, of this <br />ting, shoring and bracing shall be done in such manAer as not to <br />ng structures, private or public properties; and so as to avoid cave-ins <br />ids left by the removal of the sheeting, shoring or bracings shall be <br />ompacted with suitable materials. If, for any reason, the Contractor, <br />leave in place the sheeting, shoring or bracing, no payment shall be <br />unless ordered by the City to be left in place. <br />pumping equipment, in good working order, available at all times to <br />excavations. The Contractor shall not allow any excess water to <br />tille the trench is open. Water from ground water or surface water <br />I afrer the trench has been completely backfilled. Where the pipeline <br />work shall be conducted in such a manner that unnecessary damage <br />rk will be prevented. Provisions shall be made for the satisfactory <br />s to prevent damage to public or private property. The Contractor <br />e working conditions and suitable construction techniques. <br />line shall be removed to a depth not less than four (4) inches below <br />brought to true subgrade with the embedment or encasement shown <br />ial is encountered in the excavation at subgrade level, it shall be <br />the unsuitable material with tamped gravel, a firm and suitable <br />or crushed stone as described in this section of the specifications. <br />; City, crushed stone used in excess of the specified embedment to <br />for at the unit bid price for gravel or crushed stone embedment. <br />be piled adjacent to the work to be used for backfilling as required. <br />separately in a careful manner for replacement as specified in <br />(h) Excavation in RoCk <br />When rock is encountored in the excavation process, it shall be undercut to a depth of at least <br />six (6) inches below the bazrel and aC least three (3) inches below the bells of the pipe. The laying surface <br />shall then be brought up to grade wuh the class of embedment or encasement shown in the plans. When <br />Item 2005-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.