Laserfiche WebLink
The entire ]ength of the <br />manner: The section of the line to be tf <br />is required for the pipe to absorb such <br />filling of the line care shall be exercised <br />connections, etc., in the section under; <br />shall be stopped, regazdless of these te <br />The test shall consist of <br />percent of the working pressure for 1 <br />occuning in the section being tested, rn <br />be maintained for a period of four (4)1 <br />the test pressure shall be accurately n <br />pipeline at one time. In that event, 1 <br />necessary to inspect the surface for le <br />hours specified. <br />I.eakage during the al <br />pipe diameter per mile per 24 hours. <br />stalled line shall be field tested for water tightness in the following <br />ed shall be filled with water and allowed to stand for-such time as <br />der as it will and for the escape of all air from the line. During the <br />see that all air vents aze open, and all bulkheads, valves, manholes, <br />ing test shall be carefully examined for leakage. All known leaks <br />requirements. <br />ising and holding the hydrostatic pressure in the test section of 120 <br />ich the pipe was designed, which pressure shall be the highest <br />to exceed the design pressure of the pipe. Such test pressure shall <br />urs, during which tirne the water pumped into the line to maintain <br />sured. The Contractor may elect to test the entire length of the <br />; test pressure shall be maintained for such period of time as is <br />s throughout the length of the pipeline in addition to the four (4) <br />test shall not exceed a rate equal to 25 gallons per inch of internal <br />In the event any section of the line tested fails to meet the above specified requirements for <br />water tightness, the cause of the excess've leakage shall be determined and remedied. <br />It shall be the <br />pipeline. <br />2010.08 DISINFECTION <br />Prior to disinfecting, e: <br />flushed with clean water from the City <br />may have entered the line during constr <br />without unnecessary waste, shall be F <br />bacteriological test(s) fail, the Contrac <br />Chlorine shall be used <br />chlorine applied shall be such as to F <br />chlorinating material shall be introducc <br />the City. After a contact period of nc <br />clean water untfl the residual chlorine ( <br />being disinfected shall be opened and c <br />sample for each 1,000 feet of complete <br />1,000 feet as designated by the City E <br />of the Contractor to provide the necessary oudets for testing the <br />valved section of the new pipeline shall be pressure tested and <br />em to remove all visible evidence of dust, soil, and fine debris that <br />ion and testing. The water required to flush and disinfect the lines, <br />for by the City without chazge to the Contractor. Should the <br />shall pay for all water used to re-flush and re-disinfect the line(s). <br />o disinfect the pipeline by the following method: The amount of <br />)vide a dosage of not less than fifty (50) pazts per million. The <br />to the water ]ines and distribution system in a manner approved by <br />less than twenty-four (24) hours, the system shall be flushed with <br />ntent is not greater than 0.2 parts per million. All valves in the lines <br />,sed several times during the contract period. A minimum of one (1) <br />main shall be required or at the next available sampling point beyond <br />The wst of furnishing the chlorine, labor, tools, equipment, tests of chlorine content and the <br />bacteriological samples will be at the expense of the Contractor. No water mains shall be placed in service <br />until samples of the water from the majin, taken by the Contractor, have been submitted for tests performed <br />by an approved laboratory and a satis$actory test report has been received from the laboratory. <br />Item 2010-3 <br />