Laserfiche WebLink
16 and ~4" pipe 5.0' cover <br />12" and 0" pipe 4.5' cover <br />8" pipe <br />The subgrade shall be a <br />section, when in place, shall have a un <br />Pipe shall not be laid unless the subgrai <br />Pipe to line and grade shall be made by <br />or blocking up the bell. <br />The interior of the pipe <br />is lowered into the trench. Each pipe, <br />true to line and grade. <br />2012.04 <br />2000 psi concrete sh <br />pipelines in such manner as will brE <br />Concrete blocking shall have been in <br />Concrete blocking will not be measu <br />in the various items listed in the Pro <br />2012.05 T'ESTING <br />After the pipe has <br />such sections approved by the <br />equipment. <br />The entire length of tt <br />manner: The section of the line to be <br />is required for the cement lining of th <br />the line. During the filling of the li <br />bullcheads, valves, manholes, connect <br />leakage. Al] known leaks shall be st <br />The test shall consist <br />percent of the working pressure fo <br />occurring in the section being tested <br />be maintained for a period of four (4 <br />the test pressure shall be accurately <br />smaller 4.0' cover <br />irately shaped and trimmed to receive the pipe barrel and each pipe <br />rm beazing on the subgrade for the full length of the pipe barrel. <br />is free of water and in a satisfactory condition. Adjustments of the <br />raping away or filling in with granulaz material, and not by wedging <br />be clean and joint surfaces shall be clean and dry when the pipe <br />es, and valve shall be lowered into the trench carefully and laid <br />be placed for blocking at each change in direction of all pressure <br />the pipe against undisturbed trench walls as shown on [he plans. <br />ice four (4) days prior to testing the pipeline as hereinafter specified. <br />or paid for as a sepazate item, but the cost thereof shall be included <br />ial and Bid Schedule. <br />laid for at least seven (7) days pressure pipelines shall be tested in <br />eer. The Contractor shall furnish all labor, materials, tools and <br />installed line shall be field tested for water tightness in the following <br />-sted shall be filled with water and allowed to stand for such time as <br />pipe to absorb such water as it will and for the escape of all air from <br />; care shall be exercised to see that all air vents are open, and all <br />ins, etc., in the section undergoing test shall be cazefully examined for <br />)ped, regardless of these test requirements. <br />'raising and holding the hydrostatic pressure in the test section of 120 <br />which the pipe was designed, which pressure shall be the highest <br />ot to exceed the design pressure of the pipe. Such test pressure shall <br />hours, during which time the water pumped into the line to maintain <br />easured in a manner satisfactory to the City. <br />Leakage during the above test shall not exceed a rate equal to 25 gallons per inch of intemal <br />pipe diameter per mile per 24 hours. In the event any section of ]ine tested fails to meet the above specified <br />requirements for water tightness, the cause of the excessive leakage shall be deternilned and remedied to the <br />Item 2012-2 <br />