Laserfiche WebLink
satisfaction of the City, at the expense~of the Contractor, including re-testing if required. It shall be the <br />responsibility of the Contractor to prov de the necessary outlets for testing the pipeline. <br />2012.06 <br />Trenching, embedment, backfilling and encasement for the pipe shall be as specified in <br />Standazd Specification Item Section 20 5 or as shown on the plans. <br />2012.07 DISINFECTION <br />Prior to disinfection, <br />and flushed with clean water from the <br />which may have entered the line durv <br />the lines, without unnecessary waste, <br />the bacteriological test(s) fail, the G <br />line(s). <br />Chlorine shall be used <br />chlorine applied shall be such as to <br />chlorinating material shall be introduc <br />the Engineec After a contact period ( <br />clean water until the residual chlorine <br />being disinfected shall be opened and <br />sample for each 1,000 feet of compleo <br />1,000 feet, as designated by the City <br />The cost of furnishing <br />bacteriological samples will be at the <br />until samples of the water from the n <br />by an approved ]aboratory and a sati <br />2012.08 <br />Ductile-iron pipe shall <br />Polyvinyl Chloride Water Pipe. <br />2012.09 PAYMENT <br />h valve section of all potable water pipeline shall be pressure tested <br />ty System to remove all visible evidence of dust, soil, and fine debris <br />construction and testing. The water required to flush and disinfect <br />ill be paid for by the City without charge to the Contractoc Should <br />:ractor shall pay for all water used to re-flush and re-disinfect the <br />) disinfect the water line by the following method: The amount of <br />ovide a dosage of not less than fifty (50) parts per million. The <br />to the water lines and distribution system in a manner approved by <br />iot less than twenty-four (24) hours, the system shall be flushed with <br />ntent is not greater than 0.2 parts per million. All valves in the lines <br />)sed several times during the contact period. A minimum of one (1) <br />main shall be required, or at the next available sampling point beyond <br />chlorine, labor, tools, equipment, tests of chlorine content and the <br />ense of the Contractor. No water mains shall be placed in service <br />taken by the Contractor, have been submitted for tests performed <br />ory test report on the samples received from the laboratory. <br />connected as outlined in the Standard Specitications Item 2010 - <br />The pipeline, complete place, will be measured for payment in liner feet along the centerline <br />of the pipe actually installed including mbedment and backfilling. Measurement shall be through all fittings, <br />specia]s, valves, etc., and no deduc[ion in length shall be made for such appurtenances. Paytnent of the <br />pipeline will be paid for at the unit ¢ontract price per linear foot as provided in the Proposal and Bid <br />Schedule. Payment for connections w!ill be at the unit contract price for connection per each as provided in <br />the Proposa] and Bid Schedule. <br />Item 2012-3 <br />