accuracy or completeness thereof un~ess it is expressly provided otherwise in the Supplementary <br />Conditions. <br />43 Provisions concerning responsibi 'ties for the adequacy ofdata furnished to prospective Bidders <br />on subsurface conditions, Undergro d Facilities and other physical conditions, and possible <br />changes in the Contract Documents d e to differing conditions appear in Pazagraphs 4.2 and 43 of <br />the General Conditions. <br />4.4 Before submitting a Bid, each Bi der will be responsible to make or obtain such explorations, <br />tests and data concerning physical co itions (surface, subsurface and Underground Facilities) at or <br />contiguous to the site, or otherwise ich may affect cost, progress, performance or furnishing of <br />the Work and which Bidder deems ne essary to determine its Bid for performing and fumishing the <br />Work in accordance with the time, pri e and other terms and conditions of the Contract Documents. <br />4.5. On request in advance, Owner ill provide each Bidder access to the site to conduct such <br />explorations and tests as each Bidder eems necessary for submission of a Bid. Bidder shall fill all <br />holes, cleanup and restore the site to i s former conditions upon completion of such explorations. <br />4.6 The lands upon which the Work <br />thereto and other lands designated for <br />Contract Documents. All additional : <br />facilities or storage of materials and, <br />permanent structures or permanent ch <br />Owner unless otherwise provided in t <br />4.7 The submission of a Bid will consi <br />has complied with every requirement <br />upon performing and furnishing the I <br />methods, techniques, sequences or prc <br />the Contract Documents, and that th, <br />indicate and convey understanding of e <br />Work. <br />5. Interoretations and Addenda. <br />5.1 All questions about the meanin€ <br />Engineer. Interpretations or clazifica <br />questions will be issued by AddendE <br />having received the Bidding Documer <br />opening of Bids may not be answered. <br />binding. Oral and other interpretatior <br />5.2 Addenda may also be issued to <br />or Engineer. <br />6. Bid Securitv. <br />> to be performed, right-of-ways and easements for access <br />~e by Contractor in performing the Work aze identified in the <br />nds and access thereto required for temporary construction <br />juipment aze to be provided by Contractor. Easements for <br />iges in existing structures are to be obtained and paid for by <br />; Contract Documents. <br />ute an incontrovertible representation by Bidder that Bidder <br />f the Article 4, that without exception the Bid is premised <br />ork required by the Contract Documents and such means, <br />edures of construction as may be indicated in or required by <br />Contract Documents are sufficient in scope and detail to <br />terms and conditions for performance and furnishing ofthe <br />or intent of the Contract Documents aze to be directed to <br />ons considered necessary by Engineer in response to such <br />mailed or delivered to all parties recorded by Engineer as <br />s. Questions received less than ten days prior to the date for <br />Only questions answered by formal written Addenda will be <br />; or clazifications will be without legal effect. <br />the Bidding Documents as deemed advisable by Owner <br />6.1 Each Bid must be accompanied b Bid security made payable to Owner in an amount of five <br />percent of the Bidder's maximum pric and in the form of a certified or bank check or a Bid Bond <br />(on form attached, if a form is prescrib d) issued by a surety meeting the requirements of Paragraph <br />